| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC aOC |
| 2 | L2₹4.2 Cr+₹1.3 L (0.30%)Rejected-Finance | ₹4.2 Cr+₹1.3 L (0.30%) | L2 | Rejected-Finance Not Admitted |
| 3 | L3₹4.6 Cr+₹34.2 L (8.11%)Rejected-Finance 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | ₹4.6 Cr+₹34.2 L (8.11%) | L3 | Rejected-Finance Not Admitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
| 5 | Not Admitted-Finance DEVKHATIYA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹5.8 Cr
EMD Value
₹11.6 L
Closing Date
8 Mar 2024, 12:00 pmClosed
SE, JNP GZP CIRCEL PWD, JAUNPUR
SE, JNP GZP CIRCEL PWD, JAUNPUR
Renewal of Ghazipur Shadiyabad Bahariyabad Marg (ODR) in District Ghazipur
2024_CEUVZ_907642_1
788/SE Tender/jnp-gzp circle/23 date 23-02-2024
Open Tender
Civil Works
Percentage
240 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹11.6 L
Yes
SE, JNP GZP CIRCEL PWD, JAUNPUR
4 Oct 2024
29 Feb 2024
8 Mar 2024
29 Feb 2024
8 Mar 2024
29 Feb 2024
29 Feb 2024
Amount
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (including all labour cess but excluding GST)
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (including all labour cess but excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from ROW with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (including all labour cess but excluding GST)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 1st Year Maintenance charge @ 0% of Sub toal of Part-A work done (including all labour cess but excluding GST)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 2nd Year Maintenance charge @ 1.5% (including all labour cess but excluding GST)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 3rd Year Maintenance charge @ 3.0% (including all labour cess but excluding GST)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 4th Year Maintenance charge @ 4.50% (including all labour cess but excluding GST)
The routine maintenance of above road work including pavement, road sides and cross drains, surface drains to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the Completion Date and ends after five years. For 5th Year Maintenance charge @ 6.00% (including all labour cess but excluding GST)
RAMASHISH SINGH THEKEDAR
M/S YASH CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .