| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC 20 RAJA STREET PALAYAMKOTTAI TIRUNELVELI 627002 | TIRUNELVELI | TAMIL NADU | 627002 | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹36.6 L+₹1.1 L (3.16%)Rejected-Finance | L2 | Rejected-Finance Rejected Highest Amount |
Tender Value
₹36 L
EMD Value
₹36,000
Closing Date
30 Jun 2022, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector, Mayiladuthurai
District Collector Office, Mayiladuthurai
Construction of Threshing Floor at Annavasal pt and Kothangudi pt and Eravanchery pt and Goodalurpt andThirukkadaiyur and Kazhiyappanallur pt at Sembanarkoil Block in Mayiladuthurai Dt Pkg No 47
2022_RDTN_236714_1
851/2022/A2 Dt 10.06.2022
Open Tender
Civil Works
Item Rate
120 days
Sembanarkoil
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹36,000
Yes
District Collector Office, Mayiladuthurai
1 Aug 2022
20 Jun 2022
30 Jun 2022
20 Jun 2022
30 Jun 2022
20 Jun 2022
20 Jun 2022 - 23 Jun 2022
21 Jun 2022
Amount
1.Construction of Threshing Floor at Mankudi at Annavasal pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
2.Construction of Threshing Floor at Lingathadi at Kothangudi pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
3.Construction of Threshing Floor at Kasuvangi at Eravanchery pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
4 .Construction of Threshing Floor at Rajiv nagar at Goodalur pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
5 .Construction of Threshing Floor at Ulagamagadevi at Thirukkadaiyur pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
6 .Construction of Threshing Floor at Near kunjankulam at Kazhiyappanallur pt
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
CC 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement concrete 1:2:4 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened complete complying with standard specifications
Supply and fixing of Bitumen bads for expansion joints including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VELMURUGAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .