Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC Financially Accepted being 1st lowest | |
| 2 | L2₹12.5 L+₹3.0 L (31.0%)Rejected-Finance H NO 116 XELPEM SANGUEM GOA | SANGUEM | SANGUEM | GOA | L2 | Rejected-Finance Financially Rejected being 2nd lowest |
Tender Value
₹12.0 L
EMD Value
₹23,924
Closing Date
27 Jan 2026, 3:00 pmClosed
Harsha V. S. Kakodkar
O/o Executive Engineer, WD V, DDW, Sanguem, Goa
Urgent reinstatement of the eroded abutment wall and pipeline service road at nallah crossing near Mahadev devasthan at Mullem.
2026_DDW_27242_1
48-1/DDW-WD V-ASW/2025-26/05 L7
Open Tender
Civil Works - Water Works
Percentage
49 days
O/o Executive Engineer, WD V, DDW, Sanguem
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹23,924
17 Mar 2026
15 Jan 2026
29 Jan 2026
15 Jan 2026
27 Jan 2026
15 Jan 2026
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.;All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from the transit mixer to the site of laying excluding the cost of centering shuttering finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level;M-15 grade of concrete
Centering and shuttering including struttings propping etc. and removal of formwork for :;vertical surfaces such as retaining walls return walls walls (any thk) including attached pilasters buttresses plinth and string courses fillets etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment wing wall/return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from the transit mixer to the site of laying excluding the cost of centering shuttering finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level;M-20 grade of concrete
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.87 MB
BOQ_27684.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .