Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 CrRejected-Finance | ₹3.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.4 CrRejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.7 CrRejected-Finance | ₹3.7 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.7 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.7 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MUKESH KUMAR SHARMA L2 | M/S GEE PEE ASSOCIATES L4 | BHAMAR SINGH L5 | M/S UNITE ENTERPRISES L3 | Arvind Kumar L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00CC Lining in canal | ||||||||
| 1.01 | Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. | 3,160.14 | Cum | 50 ₹1.6 L | 60 ₹1.9 L | 70 ₹2.2 L | 72 ₹2.3 L | 50 ₹1.6 L |
| 1.02 | Provide shuttering and centering including all materials and T&P etc for proper complition of work. | 5,044.53 | Sqm | 500 ₹25.2 L | 630 ₹31.8 L | 725 ₹36.6 L | 345 ₹17.4 L | 100 ₹5.0 L |
| 1.03 | C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work. | 379.9 | Cum | 5,500 ₹20.9 L | 6,950 ₹26.4 L | 5,000 ₹19.0 L | 8,150 ₹31.0 L | 5,000 ₹19.0 L |
| 1.04 | Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. | 1,262.53 | Cum | 500 ₹6.3 L | 460 ₹5.8 L | 500 ₹6.3 L | 745 ₹9.4 L | 400 ₹5.1 L |
| 1.05 | Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc. | 15,158 | Sqm | 12 ₹1.8 L | 20 ₹3.0 L | 60 ₹9.1 L | 18.5 ₹2.8 L | 5 ₹75,790 |
| 1.06 | 60 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work | 912.72 | Cum | 5,800 ₹52.9 L | 8,150 ₹74.4 L | 6,500 ₹59.3 L | 8,645 ₹78.9 L | 6,000 ₹54.8 L |
| 1.07 | Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work | 3,701.06 | R.M | 28 ₹1.0 L | 20 ₹74,021.20 | 250 ₹9.3 L | 45 ₹1.7 L | 10 ₹37,010.60 |
| 2.00C.C lining in u/s and d/s of v.r.b/d.r.b of partapur dy. | ||||||||
| 2.01 | Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. | 979.89 | Cum | 50 ₹48,994.50 | 60 ₹58,793.40 | 70 ₹68,592.30 | 72 ₹70,552.08 | 50 ₹48,994.50 |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
6 Nov 2025, 12:00 pmClosed
S E
OFFICE OF SE MGCCC-1, MEERUT
02/SE/MRT/2025-26(LOT1)
2025_UPIDC_1087611_1
02/SE/MRT/2025-26
Open Tender
Civil Works
270 days
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.4 L
Yes
27 Feb 2026
1 Nov 2025
6 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TDNIT02SEMRT.pdf
Tender Documents • 1.00 MB
BOQ_1995002.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid