Loading…
Loading…
Tender Value
₹26.6 Cr
EMD Value
₹26.6 L
Closing Date
25 Jun 2026, 5:00 pm
CHIEF ENGINEER OPHWC
OPHWC BHUBANESWAR
Building Work
2026_OSPHW_131097_2
04/OPHWC/2026-27
National Competitive Bid
Civil Works - Buildings
540 days
Jajpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹26.6 L
Yes
4 Jun 2026
4 Jun 2026
29 Jun 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CVL | - | - | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | 50000001
Earthwork in stoney earth and gravel mixed stone and boulder not exceeding 0.014 cum in volume within 50 m. initial lead and 1.5 m. initial lift including rough dressing and breaking clods to maximum 5 cm. to 7 cm. and laying in layers not exceeding 0.3 m. depth.
Ground Floor | 1,006.61 | CUM | 427.3 | ₹4,30,124.45 | BI01010001010000000000000515BI0100001114 |
| 3 | 50000003
Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curing, shuttering etc. complete at all depth and height.
Ground Floor | 261.93 | CUM | 5,291.1 | ₹13,85,897.82 | BI01010001010000000000000515BI0100001115 |
| 4 | 50000008
"Providing and laying reinforced cement concret of M-20 grade with 20mm and down grade black hard grinite(crusher broken) stone chips including cost of all materials, labours T&P etc. Complete but excluding the cost of reinforcement. "
Ground Floor | 42.27 | CUM | 5,588.62 | ₹2,36,230.97 | BI01010001010000000000000515BI0100001116 |
| 5 | 50000017
Supplying of filling sand in foundation and plinth including watering, ramming, consolidating and dressing, labours, tools all complete.
Ground Floor | 1,470.81 | CUM | 754.4 | ₹11,09,579.06 | BI01010001010000000000000515BI0100001117 |
| 6 | 50000018
"4"" thick dry brick rammed khoa well watered and fully consolidated complete,including cost of all materials as per direction of Engineer-in-charge. "
Ground Floor | 4.35 | CUM | 446.5 | ₹1,942.27 | BI01010001010000000000000515BI0100001118 |
| 7 | 50000020
12mm thick cement plaster in cement mortar 1:6 (1cement:6sand) including necessary scaffolding curing etc. all complete at all depth and height.
Ground Floor | 2,298.39 | SQM | 187.02 | ₹4,29,844.9 | BI01010001010000000000000515BI0100001119 |
| 8 | First Floor | 852.6 | SQM | 194.89 | ₹1,66,163.21 | BI01010001010000000000000515BI0100001120 |
| 9 | Second Floor | 1,569.02 | SQM | 203.15 | ₹3,18,746.41 | BI01010001010000000000000515BI0100001121 |
| 10 | Third Floor | 223.96 | SQM | 211.82 | ₹47,439.21 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
DTCN2.pdf
Tender Documents • 1.40 MB
BOQ_594606.xls
BOQ • 1.97 MB
Download all tender documents and submit your bid