Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -36.01% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹4,372.78 (3.50%)Admitted-Finance | -33.77% | ₹1.3 L+₹4,372.78 (3.50%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 L+₹12,181.32 (9.75%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | -29.77% | ₹1.4 L+₹12,181.32 (9.75%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 L+₹19,345.65 (15.5%)Admitted-Finance | -26.10% | ₹1.4 L+₹19,345.65 (15.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 L+₹33,654.79 (26.9%)Admitted-Finance | -18.77% | ₹1.6 L+₹33,654.79 (26.9%) | L5 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
1 Sept 2026, 6:00 pmClosed
Executive Enginner REW jammu
Executive Enginner REW jammu
Constt.of Lane Drain from house of Rakesh to Ho of Vijay near Pond,Pyt Daskal,Block Akhnoor Under scheme DDC District Capex Budget for the year 2026-27 (Block level)
2026_RDPR_322114_4
e-NIT No. 484 REWJ of 2026-27 dated 24-08-2026
Open Tender
Civil Works
Percentage
Executive Enginner REW jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,900
7 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalitiesnot exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 74.35 | sqm | 24.12 | ₹1,793.32 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 7.75 | cum | 4,826.5 | ₹37,405.38 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 2.63 | cum | 5,733.6 | ₹15,079.37 |
| 4 | Providing and laying 60mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. allcomplete as per direction of Engineer-in-charge. | 163.57 | sqm | 816.15 | ₹1,33,497.66 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 4.6 | sqm | 286.35 | ₹1,317.21 |
| 6 | Carriage of Sand avg. 6 km lead by MT | 4.98 | cum | 216.4 | ₹1,077.67 |
| 7 | Carriage of C/bajree avg. 6 km lead by MT | 9.44 | cum | 216.4 | ₹2,042.82 |
| 8 | Providing and fixing Display board including painting,writing all complete | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1077786.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .