Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance KOTHAR MAJALI SADASHIVGAD KARWAR UTTARA KANNADA 581360 | KARWAR | UTTARA KANNADA | KARNATAKA | 581360 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
Closing Date
31 Jan 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(SB) Karwar
GE(SB) Karwar-581308
MAINTENANCE and OPERATION OF AC PLANT 1300TR CAPACITY AND SCADA SYSTEM AT INS VAJRAKOSH SITE E UNDER GE SB KARWAR
2022_MES_503775_1
3002/54/E3 dt 25 Jan 2022
Limited
Job Works
Works
30 days
GE(SB) Karwar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
1 Feb 2022
25 Jan 2022
1 Feb 2022
25 Jan 2022
31 Jan 2022
25 Jan 2022
45 days
Amount
MAINTENANCE & OPERATION OF AC PLANT 1300TR CAPACITY AND SCADA SYSTEM AT INS VAJRAKOSH SITE 'E' UNDER GE(SB) KARWAR 1 It is requested to take early action to carry out the following job works which is urgently required to smooth function of this office 1. Maintenance & operation of central AC plant of total 1300 TR capacity installed at MTP area with package chiller condensing unit for LR-SAM magazines of (Make :-DUNHAM BUSH , Model No. AFHX325-5CR of 900 TR capacity ) & BROHMAS magazines of (Make :- VOLTAS , Model No. EGADXR2302MZ of 400 TR capacity ) complete including SCADA system of Make : Honeywell with AHU & other accessories each for 24 hrs 3 shifts around the clock run daily a) Air cooled package chiller unit of (Make DUNHAM BUSH , Model - AFHX325-5CR) -03Nos , for LR-SAM magazines. b) Air cooled package chiller unit of (Make VOLTAS , Model -EGADXR2302MZ) - 02Nos , for BROHMAS magazines. c) Compressor of (Make: DUNHAM BUSH , Model - HX1816LA35AV1C2A) - 6 Nos for LR-SAM d) Compressor of (Make: BITZER KUHLMASCHINENVAU, Model - CSH9563-160Y-40D) - 4 Nos for BROHMAS e) Condensor fan motor of capacity 3 HP/2.2 KW - 48 Nos for LR-SAM f) Condensor fan motor of capacity 1.5 KW - 32 Nos for BROHMAS g) Primary water pump motor Model - MMG 160MB , capacity 15 KW, Make - CE GRUNDFOS -03Nos for LR-SAM h) Primary water pump motor Model - MMG 160MA , capacity 11 KW, Make - CE GRUNDFOS -02Nos for BROHMAS i) Primary water pump Model - NB 80-160 , discharge- 183.9 cum/hr, Head - 20 mtrs Make - CE GRUNDFOS -03Nos for LR-SAM k) Secondary water pump motor Model - MMG 200LB , capacity 37 KW, Make - CE GRUNDFOS -03Nos for LR-SAM l) Secondary water pump motor Model - UD 1104 , capacity 37 KW/50 HP, Make - SIEMENS -02Nos for BROHMAS m) Secondary water pump Model - NB 80-200 , discharge- 183.9 cum/hr, Head - 54 mtrs Make - CE GRUNDFOS -03Nos for LR-SAM n) Secondary water pump Model - NB 80-200 , discharge- 183.9 cum/hr, Head - 54 mtrs Make - CE GRUNDFOS -02Nos for BROHMAS o) Air handling unit model ZDHRW-250 of capacity 25000 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -19 Nos. Make - Zeco for LR-SAM p) Air handling unit model ZDS-80 of capacity 8000 cmh with blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -10 Nos. Make - Zeco. For BROHMAS q) Hot water generator 2 steps 415 volts of capacity- 30 KW , Model - RC/30 - 12 Nos of Make - Rapid Cool for LR-SAM r) Hot water generator 3 steps 415 volts of capacity- 15 KW , Model - RC/15 - 10 Nos of Make - Rapid Cool for BROHMAS s) SCADA system of make : Honeywell with connected accessories
NOTES:- a) Contractor has to employ minimum following staff for Manning and operation of the Main receiving Substation at Vajrakosh in all 3 shifts 8 hours each. (i) One No MCM / Supervisor having minimum qualification Diploma in Refrigeration & Air Conditioning Engineering from recognized institute with adequate experience in one shift of 8 hrs (Total - 01 Nos per day) (ii) One No operator having minimum ITI qualification in Ref Mech trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of AC plant including maintenance/check/inspection of electrical panel board.. (Total 03 Nos Per day) (iii) One No Electrician highly skilled / operator having minimum ITI qualification trade from Govt recognized institute with minimum 02 years experience in maintenance & operation of AC plants in each shift of 08 hours (Total 03 Nos Per day) (a) Contractor will maintain proper records of all kinds of daily, weekly , monthly or whatsoever maintenance is carried out during job order period in a binded book/register and will obtain the signature of Engineer-in-Charge (b) The operator will ensure general cleanliness and upkeep of the installation on daily basis. (c) Contractor shall maintain log sheet of installations,lodging of complaints if found defects in plants,monitoring of PLC including taking care of chiller plants,monitoring of make up water tanks , pilferage theft or damages etc. (d) Power supply for operating the installations will be made availiable by department free of cost. (e) The rate quoted shall deemed to be inclusive of safety gear and required tools for minor maintenaince. In case of failure to provide tools kit and safety kits (gum boots-02pairs, hand gloves, uniform as per size suitable for individual employed) penalty of RS.3000/- per person per month will be recovered and levied. (f) The Contractor shall pay the wages to the operators/helpers (as applicable) through e payment i.e. Aadhar linked bank accounts (credit to their bank account). GE shall ensure that e-payment made to the opreator / helper and their wages shall not be less than minimum wages fixedd by state Govt or Central Govt whichever is more. Monthly e banking statement shall be furnished by contractor to the GE and the same shall be kept in record duly verified. (g) If the Contractor fails of provide required man power for any of the shift, a panel recovery at the double of the quoted rate per shift shall be recovered from amount due to Contractor.
Terms & conditions 1. Rates quoted will deemed to have included all taxes like GST as applicable and no separate cost wise be paid on account of same. 2. Unserviceable dismantled materials will be the property of the department. 3. You will liable for completion of job works within 30 days of placing Job Order. 4. 100% payment will be made on completion of job work against your bill. 5. Job Order can be closed in short notice (i.e 24 hours in advance) on Acceptance of Tender and the payment will be made till the date of acceptance of tender.
Shree Ayyappa Engineering
JAI SHREE GOPAL ELECTRICALS
OM SAI ELECTRICALS AND HARDWARES
stage.html
html • 0.02 MB
finance_562849.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .