Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SUBHASH NAGAR BALLIA | BALLIA | BALLIA | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
25 Jul 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
Electy Trans. Division Delhi- Meerut Road Muradnagar
REPLACEMENT OF DAMAGED CONDUCTOR OF 132kV MURADNAGAR-DASNA LINE AND 132kV MURADNAGAR-FARIDNAGAR LINES AT GANTRY OF THE SUBSTATION UNDER ELECTRICITY TRANSMISSION DIVISION, MURANAGAR.
2020_UPTCL_489422_1
T-15/ETD/M/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
MODINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
EE ETD MURADNAGR EXPENDITURE ACCOUNT HDFC BANK
₹2,000
Yes
28 Jul 2020
2 Jul 2020
25 Jul 2020
2 Jul 2020
25 Jul 2020
2 Jul 2020
60 days
Amount
Replacement of damaged R & B phase conductor of 132kV Muradnagar-Dasna line at gantry of the 132kV Dasna bay ( between tower No. 01 and Gantry of the substation, approx. 70 meter). work includes lowering down the conductor after removing of jumper at tension tower, tension fitting hook, removing of the jumper from line to PT, LA, removing of jumper from line to isolator after removing of suspension fitting etc. laying of new conductor of proper length after marking of the conductor pressing of tension fitting at both end of the conductor, connecting of string after cleaning, lifting of the conductor hanging it on cross arm and gantry of the bay and connecting of jumper at tension tower, connecting of the jumper from line to PT, LA ( Replace the jumper if required by new panther conductor).
Replacement of jumper from gantry to isolator by panther conductor after marking of the jumper and pressing of jumper cone at one end, connecting suspension fitting, lifting of jumper and connect one end at tension fitting, at gantry with suspension fitting and isolator string etc.
Replacement of damaged R, Y & B phase conductor of 132kV Muradnagar-Faridnagar line at gantry of the 132kV Faridnagar bay ( between tower No. 01 and Gantry of the substation, approx. 70 meter). work includes lowering down the conductor after removing of jumper at tension tower, tension fitting hook, removing of the jumper from line to PT, LA, removing of jumper from line to isolator after removing of suspension fitting etc. laying of new conductor of proper length after marking of the conductor pressing of tension fitting at both end of the conductor, connecting of string after cleaning, lifting of the conductor hanging it on cross arm and gantry of the bay and connecting of jumper at tension tower, connecting of the jumper from line to PT, LA ( Replace the jumper if required by new panther conductor).
Replacement of jumper from gantry to isolator by panther conductor after marking of the jumper and pressing of jumper cone at one end, connecting suspension fitting, lifting of jumper and connect one end at tension fitting, at gantry with suspension fitting and isolator string etc.
ASHUTOSH ENTERPRISES
JAGAT ELECTRICAL & FABRICATORS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .