Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC | L1 | Accepted-AOC SUCESSFUL BIDDER | |
| 2 | NA₹41.6 LRejected-Finance AT D 5 LINGARAJ VIHAR POKHARIPUT BHUBANESWAR DIST KHURDHA | BHUBANESWAR | KHURDHA | ODISHA | 751020 | NA | Rejected-Finance UNSUCESSFUL BIDDER | |
| 3 | NA₹43.8 LRejected-Finance 1ST FLOOR SAI COMPLEX BESIDES ADITYA VIP CONCLAVE NEAR GANESH MANDAP CHHAK JHARPADA BHUBANESWAR | BHUBANESWAR | KHORDHA | ODISHA | 751006 | NA | Rejected-Finance UNSUCESSFUL BIDDER | |
| 4 | Rejected-Technical AT A 48 NABAKRUSHNA NAGAR PO SONAPARBAT PS TANGARPALI ROURKELA ODISHA 769016 | SUNDARGARH | ODISHA | 769016 | - | Rejected-Technical NOT Fulfilled eligibility criteria |
| Sl No | Description | Qty | Unit | AADYA URJA SOLUTIONS PRIVATE LIMITED L4 | M/s. Mahaveer Enterprises L2 | JUPITER ENGINEERS L3 | M/S ORISSA TRADING HOUSE, PROP. RITU MODI L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation , testing & commissioning of Double pole Mounted 100 KVA, 11kV/430V, 3 Phase, 50 Hz, Aluminum Wound, Oil cooled, ISI marked and BEE Labelled Distribution Transformer as per IS 1180 Level 2. Losses at 100% Load - 1650 Watt, Losses at 50% Load - 475 Watt, Oil - 250 Liter,using 11mtr WPS (Wide Parallel Flange beams) pole of size - 160 x 152 mm (11mtr long,30.44kg/mtr including cost of all material, Labour, Transportation & Errection etc complete as per direction of Engineer-in-charge. | 1 | Job | 4,00,000 ₹4,00,000 | 7,00,000 ₹7,00,000 | 3,99,547 ₹3,99,547 Lowest | 5,62,996 ₹5,62,996 |
| 2.00 | Construction of 3 phase 3wire 11kv Over head line using 80 sqmm AAC ON WPB ( GI) Pole of size - 160 x 152 mm(11mtr long,30.44kg/mtr (40 Mtr/span) with cut point & civil work as per requirment including cost of civil work all material, Labour, Transportation etc complete as per direction of Engineer-in-charge. | 1 | Span | 84,700 ₹84,700 | 90,000 ₹90,000 | 1,87,022 ₹1,87,022 | 19,961 ₹19,961 Lowest |
| 3.00 | Supply and laying of 95 sqmm 4 core XLPE insulated PVC sheathed armured AL Cables for working voltages upto and including 1100 Volts Conforming to IS : 7098 (Part-I) : 1988(With Latest amendment ) including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge. ( 1 Ckt for Spare Cable) | 770 | mtr | 600 ₹4,62,000 Lowest | 746.75 ₹5,74,997.5 | 1,020.12 ₹7,85,492.4 | 719 ₹5,53,630 |
| 4.00 | Supplying all materials, labour, T&P for fitting and fixing of 75 mm dia HDPE Pipe of ORIPLAST/SUPREME or equivalent make including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge. | 750 | Mtr | 300 ₹2,25,000 | 226.67 ₹1,70,002.5 | 765.09 ₹5,73,817.5 | 155.6 ₹1,16,700 Lowest |
| 5.00Supply, Installation, testing and commissioning of CPCB IV+ 100 KVA, 3 Phase, 415V AC, Silent DG Set comprising of Engine, with minimum rated BHP (As per Engine Manufacturer Standard) at 1500 RPM, coupled with alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame complete with Engine, Engine, with minimum rated BHP (As per Engine Manufacturer Standard) at 1500 RPM, coupled with alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame complete. | |||||||
| 6.00AMF control panel (Comprising of Minimum 160 Amp MCCB & Relays for both DG & Main Supply) | |||||||
| 7.00Fuel tank | |||||||
| 8.00Battery & leads | |||||||
| 9.00Silencer – Residential | |||||||
| 10.00AVM pads | |||||||
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Jun 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer , O.T.D.C Ltd
Superintending Engineer , O.T.D.C Ltd, Lewis road Bhubaneswar
External Power Supply to Sound and Light Multimedia Show at Khandagiri-Udayagiri Caves, Bhubaneswar.
2025_OTDC_113807_1
BP I/08/2025-26 Dt.19.05.2025
National Competitive Bid
Electrical Works
Item Rate
60 days
Khandagiri-Udayagiri Caves, Bhubaneswar
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹50,000
Yes
2 Sept 2025
24 May 2025
3 Jun 2025
24 May 2025
2 Jun 2025
24 May 2025
Amount
Supply, Installation , testing & commissioning of Double pole Mounted 100 KVA, 11kV/430V, 3 Phase, 50 Hz, Aluminum Wound, Oil cooled, ISI marked and BEE Labelled Distribution Transformer as per IS 1180 Level 2. Losses at 100% Load - 1650 Watt, Losses at 50% Load - 475 Watt, Oil - 250 Liter,using 11mtr WPS (Wide Parallel Flange beams) pole of size - 160 x 152 mm (11mtr long,30.44kg/mtr including cost of all material, Labour, Transportation & Errection etc complete as per direction of Engineer-in-charge.
Construction of 3 phase 3wire 11kv Over head line using 80 sqmm AAC ON WPB ( GI) Pole of size - 160 x 152 mm(11mtr long,30.44kg/mtr (40 Mtr/span) with cut point & civil work as per requirment including cost of civil work all material, Labour, Transportation etc complete as per direction of Engineer-in-charge.
Supply and laying of 95 sqmm 4 core XLPE insulated PVC sheathed armured AL Cables for working voltages upto and including 1100 Volts Conforming to IS : 7098 (Part-I) : 1988(With Latest amendment ) including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge. ( 1 Ckt for Spare Cable)
Supplying all materials, labour, T&P for fitting and fixing of 75 mm dia HDPE Pipe of ORIPLAST/SUPREME or equivalent make including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge.
Supply, Installation, testing and commissioning of CPCB IV+ 100 KVA, 3 Phase, 415V AC, Silent DG Set comprising of Engine, with minimum rated BHP (As per Engine Manufacturer Standard) at 1500 RPM, coupled with alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame complete with Engine, Engine, with minimum rated BHP (As per Engine Manufacturer Standard) at 1500 RPM, coupled with alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame alternator of same make mounted on a common base frame complete.
AMF control panel (Comprising of Minimum 160 Amp MCCB & Relays for both DG & Main Supply)
Fuel tank
Battery & leads
Silencer – Residential
AVM pads
First Fill of lube oil
Acoustic enclosure
Earth work in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and as per direction of the department.
Supplying and filling with sand in foundation and plinth in layers not exceeding 20 cm in depth, well watered and compacted , top surface dressed and levelled to proper level and gradient including cost of all materials, conveyance, taxes, royalties, loading, unloading, cost of all labour, T&P, etc. all complete as per the direction of Engineer-in-Charge.
Construction of DG Base with RCC of size 5.00mtr x 2.50 mtr x 0.45 mtr including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge.
Construction of DG Shed with 50mm/40mm dia GI pipe & Tata Bluescope roofing of size 7.00 mtr x 5.00 mtr including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge.
Road/trench cutting minimum (W-0.90m x D-0.90m) for laying of LT cable & sand filling including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge. (From Transformer to Control room)
Dismantling brick or stone masonry in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead. (As per the requirement)
Providing & laying Laterite Stone small eye masonary work in Foundation in cement mortar (1:4) including cost of all material, Labour, Transportation etc complete as per direction of Engineer-in-charge.
Providing and lying plain cement concrete of proportion (1:2:4) in foundation and floors using Portland Slag Cement(PSC) with 4 cm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per specification and direction of Engineer-in-charge.
M/s. Mahaveer Enterprises (BID ID -2944010)
JUPITER ENGINEERS (BID ID -2948462)
AADYA URJA SOLUTIONS PRIVATE LIMITED (BID ID -2942570)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_540967.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .