| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29,566Accepted-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L1 | Accepted-AOC L1 | |
| 2 | L2₹30,840+₹1,640 (5.62%)Rejected-AOC 22A SOUTH BEACH ROAD TUTICORIN 01 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SNS MECHATRONICS | VEL ENGINEERING |
|---|---|---|---|---|---|
| 1.10 | Charges for complete rewinding of 3ph 15 KW LT motor of condenser pump 'B' motor of Unit IV & V AC Plant , transporting to workshop, removing the existing winding from the stator ,cleaning of slots & insulating, rewinding with F class wire in the motors (retrieved copper wire will be retained by the contractor) tapping by 16 sq. mm main lead wire, checking of bearings and replacing of bearings if necessary (bearing will be supplied by TNPGCL) again transporting to site, placing in its location, termination of power cable and commissioning. | 1 | No | 16,790 ₹19,812.2 | 16,060 ₹18,950.8 Lowest |
| 1.20 | Material cost for rewinding of 1 no 15 KW motor | 1 | No | 14,260 ₹16,826.8 | 13,640 ₹16,095.2 Lowest |
| 1.30 | Contractor scope material:
Ball bearing No: 6209 | 1 | No | 590 ₹696.2 | 560 ₹660.8 Lowest |
| 1.40 | Contractor scope material:
Ball bearing No:6309 | 1 | No | 620 ₹731.6 | 590 ₹696.2 Lowest |
| 1.50 | Contractor scope material:
Ball bearing No:6309 | 3 | Nos | 1,650 ₹1,947 | 1,590 ₹1,876.2 Lowest |
| 2.00 | Charges for transport of motor from TTPS to workshop and back from workshop to TTPS. | 1 | Ls | 830 ₹979.4 | 790 ₹932.2 Lowest |
| 3.00 | Less: Cost of retrieved copper (The copper scrapped to be retrieved by the contractor | 13 | Kgs | 3,900 ₹4,602 Lowest | 4,030 ₹4,755.4 |
Tender Value
Refer Docs
Closing Date
18 Aug 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM II AC Plant Complete rewinding of 3 PH LT Motor of capacity of 15 KW condenser pump B at Unit IV and V AC plant
2025_EB_588027_1
CE/SE/O/TTPS/Spec.No.159/25-26
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Yes
17 Oct 2025
2 Aug 2025
19 Aug 2025
2 Aug 2025
18 Aug 2025
2 Aug 2025
Charges for complete rewinding of 3ph 15 KW LT motor of condenser pump 'B' motor of Unit IV & V AC Plant , transporting to workshop, removing the existing winding from the stator ,cleaning of slots & insulating, rewinding with F class wire in the motors (retrieved copper wire will be retained by the contractor) tapping by 16 sq. mm main lead wire, checking of bearings and replacing of bearings if necessary (bearing will be supplied by TNPGCL) again transporting to site, placing in its location, termination of power cable and commissioning.
Material cost for rewinding of 1 no 15 KW motor
Contractor scope material: Ball bearing No: 6209
Contractor scope material: Ball bearing No:6309
Contractor scope material: Ball bearing No:6309
Charges for transport of motor from TTPS to workshop and back from workshop to TTPS.
Less: Cost of retrieved copper (The copper scrapped to be retrieved by the contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .