Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.0 LAccepted-AOC 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹66.1 L+₹17,395.52 (0.26%)Rejected-Finance 1 1 A VANSATTART ROW 3RD FLOOR ROOM NO 2A | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹66.6 L+₹65,531.13 (0.99%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED L2 | ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd. L1 | CONCORD ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00 | Part-A (Labour Portion)
Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000 ml/500 ml capacity at Mongal Pandey Bottling Plant in the district of North 24 Pgs. by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing filling capping machine (1 No.), labeling machine & batch code machine (1 No.), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automation system (1 No.) Security guard (1 No.) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant. | 12 | months | 1,83,000 ₹21,96,000 | 1,82,968 ₹21,95,616 Lowest | 1,84,798 ₹22,17,576 |
| 1.01 | Provision of Electrician visit to oversee the overall power circuit and electrical accessories and machineries. | 365 | days | 760 ₹2,77,400 | 758 ₹2,76,670 Lowest | 765 ₹2,79,225 |
| 2.00Part-B (Supervision Portion) | ||||||
| 2.01 | skilled supervisor for supervision of entire installation for trouble free operation including manning, control, output data generation etc. | 12 | months | 23,100 ₹2,77,200 | 23,039 ₹2,76,468 Lowest | 23,260 ₹2,79,120 |
| 2.02 | sweeping of garbage from bins of different area in side the plant, collecting from roads, intermediate path way, back side of the plant , cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, rooms to ensure highest level of hygenic condition inside the plant, cleaning of all grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc. as per direction of EIC.for 12 months | 12 | months | 11,460 ₹1,37,520 | 11,398 ₹1,36,776 Lowest | 11,512 ₹1,38,144 |
| 2.03 | Sweeping cleaning of store area and its adjacent roads, collecting of garbage from the different area inside the store, cleaning of roofs including collection of dust also mopping of inside area of the whole store rooms etc. and maintain proper hiegine as per direction including supply of all necessary T & P item like brooms, approved disinfectant, floor cleaner, room freashner etc. as per direction of EIC. | 12 | months | 11,500 ₹1,38,000 | 11,399 ₹1,36,788 Lowest | 11,510 ₹1,38,120 |
| 3.00Part-C (Daily/Weekly/Monthly Maintenance) | ||||||
| 3.01Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc. to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade ( RFC & labelling machine ), FRL- 32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area (4 times in month). PET Blowing, RFC, Labelling, Batch coding & Shrink Wrapping Machine( 4 times in a month) and HP compressor with Dryer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc ( 4 times in a month) and pouch filling machines (4 times in amonth).Raw materials to be kept properly in good condition and | ||||||
| 3.02Deployment of skilled technician of work force to undertake routine daily /weekly / monthly periodical machine wise maintenance work strictly adhering to the maintenance guidilines of the manufacturer including other routine (daily / weekly /monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Deparmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 12 months | ||||||
| 3.03Static Portion:- | ||||||
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
26 Aug 2025, 4:00 pmClosed
Executive Engineer Electrical Divn PHED
P16 India Exchange Place CIT Annexe Bldg Extn 2nd floor Kol 73
E/M works
2025_PHED_889674_4
WBPHED / EE / ED / 12 / 2025-26
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Office of the Executive Engineer ED PHED
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.4 L
6 May 2026
11 Aug 2025
28 Aug 2025
11 Aug 2025
26 Aug 2025
11 Aug 2025
Amount
Part-A (Labour Portion) Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000 ml/500 ml capacity at Mongal Pandey Bottling Plant in the district of North 24 Pgs. by providing sufficient skilled machine operator for pet Blowing machine (1 No.), Rinsing filling capping machine (1 No.), labeling machine & batch code machine (1 No.), shirnk wrapping machine (1 No.), water treatment plant (1 No.), High pressure Compressor, Low pressure Compressor, Chiller and Cooling tower (1 No.). Assistant operator cum helper for despatch of finished product to ware house (1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automation system (1 No.) Security guard (1 No.) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant.
Provision of Electrician visit to oversee the overall power circuit and electrical accessories and machineries.
Part-B (Supervision Portion)
skilled supervisor for supervision of entire installation for trouble free operation including manning, control, output data generation etc.
sweeping of garbage from bins of different area in side the plant, collecting from roads, intermediate path way, back side of the plant , cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, rooms to ensure highest level of hygenic condition inside the plant, cleaning of all grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc. as per direction of EIC.for 12 months
Sweeping cleaning of store area and its adjacent roads, collecting of garbage from the different area inside the store, cleaning of roofs including collection of dust also mopping of inside area of the whole store rooms etc. and maintain proper hiegine as per direction including supply of all necessary T & P item like brooms, approved disinfectant, floor cleaner, room freashner etc. as per direction of EIC.
Part-C (Daily/Weekly/Monthly Maintenance)
Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc. to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade ( RFC & labelling machine ), FRL- 32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area (4 times in month). PET Blowing, RFC, Labelling, Batch coding & Shrink Wrapping Machine( 4 times in a month) and HP compressor with Dryer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc ( 4 times in a month) and pouch filling machines (4 times in amonth).Raw materials to be kept properly in good condition and
Deployment of skilled technician of work force to undertake routine daily /weekly / monthly periodical machine wise maintenance work strictly adhering to the maintenance guidilines of the manufacturer including other routine (daily / weekly /monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Deparmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 12 months
Static Portion:-
WTP areas (Dual Media, UF, RO, Ozanator etc.
Motive Portion:-
PET blowing machine, RFC, Labeling machine, shrink wrapping machine
HP compressor with dryer, LP compressor with dryer, chiller tower, CW pump etc. including leakage test of entore pneumatic, conveying main including calibration of gauges.
Miscellaneous Charges:-
Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment / topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc.
Making arrangement for monthly preventive maintenance by manufacturer / parent company of a)PET Blowing Machine b) RFC Machine c) Labelling Machine d) Batch Coding Machine e) High pressure Compressor with Dryer f) Low pressure Compressor with Dryer g) Chiller h) Cooling Tower i) Shrink Wrapping machine j) Water Treatment Plant by deploying Service Enginner of the parent manufacturing company as per preventive maintenance schedule with all incidental charges for setting and resetting of different critical process related field instrumena alongwith replacement of spares of these plants . A seperate register for attaing monthly preventive maintenace by the parent manufacturing company is to be kept at site duly authenticated by the concerned Engineer-In -charge and should be submitted during preparation of bill.
Deployment of Service Engineer of the parent company with all conveynance for setting, re-setting and calibration of the equipment upto the level of standard
Rinsing Filling cleaning machine (involving of 2 days)
Labeling machine (involving of 2 days)
PET blowing machine (involving of 2 days)
High Pressure compressor (involving of 2 days)
Low Pressure compressor (involving of 2 days)
Chiller (involving of 1 day)
Cooling tower (involving of 1 day)
Shrink Wrap Machine (involving of 1 day)
Water Treatment plant (involving of 2 days)
Batch code machine (involving of 1 day)
Reimbursement of Additional wages, to be paid to the operators in case of enhancement of wages if any by the appropriate authority of Government and as fixed by the EIC within the period of work order [Actual amount will be based on the rate which will be fixed as incresed wages + 8.33% bonus + 10% contractors profit for item Sl. no. 1 (a) only]. This item will be applicable only if the daily minimum wages are increased further within the period by the appropiate Government authority.
Add: 18% GST
Add: 1% CESS
JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED (BID ID -6840793)
CONCORD ENGINEERING (BID ID -6850234)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_2006931.xls
BOQ • 0.25 MB
TermsConditions.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .