| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-AOC 0 GAURI PARGANA PURVI MATA MANDIR BIJNOR LUCKNOW UTTAR PRADESH 226008 | LUCKNOW | UTTAR PRADESH | 226008 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹33.0 L+₹7.1 L (27.4%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹33.4 L+₹7.5 L (28.9%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST | |
| 4 | Rejected-Technical | - | Rejected-Technical Technical bid not qualified |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
14 Oct 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Srirampuram Colony Mohaddipu, Gorakhpur.
Construction of 33 KV Underground line Mahiganj S/S
2024_PVVNV_963854_1
12/EWC(G)/2024-25
Open Tender
Electrical Works
Item Wise
30 days
Deoria
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EWC
₹31,000
Yes
25 Nov 2024
8 Oct 2024
15 Oct 2024
8 Oct 2024
14 Oct 2024
8 Oct 2024
Amount
Part A (Materials Provided by contractor)
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
Danger Board with Clamp
Barbed wire
Bolts, Nuts, & Washers
Complete Stay (GI Stay rod 20x1800mm, stay wire 7/8 SWG 10 Kg, stay clamp, bolt, nut& washer with concerte grouting)
MS Earthing Rod 20x2500 mm
M.S. Angle Iron 65x65x6mm bracing with clamps
33 KV. Top channel (125x65mmX3200 mm (10.7 Kg/m) with clamps
GI Wire 5 mm
PART- B WORK Shifting,loading and carriage of following materials on private truck at store centre Maharajganj & Un-loading of the same with proper stacking at work site .
33 KV ‘XLPE’ Cable 3x300mm²
Laying of 33 KV 3x300 mm² ‘XLPE’ cable of by digging pit below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks/ HDD Method by drilling machine as per site requirement.
Laying of 33KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work.
Cable jointing charges of 33 KV XLPE Cable Outdoor.
Cable jointing charges of 33 KV XLPE Cable Straight Through.
GI Pipe Earthing Complete for Cable jointing Kit with materials
Erection of Double pole structure on 9 Mtr PCC Pole For Both side U/G line. including all works of evocation of pit, pole erection & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete as per RESSPO) .
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
M/s VIRENDRA KISHOR PANDEY
m/s apurve enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .