Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹1.3 Cr (92.0%)Rejected-Finance | ₹2.7 Cr+₹1.3 Cr (92.0%) | L2 | Rejected-Finance Not being lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Recommended being two class below the eligible class |
| 4 | Rejected-Technical 19192 STREET NO 8 BIBI WALA ROAD OPPOSITE DAV COLLEGE BATHINDA PUNJAB PIN 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | - | - | Rejected-Technical Not Recommended as not enlisted in c(ii) category |
| 5 | Rejected-Technical R O WARD NO 08 H NO 108 DHAR ROAD UDHAMPUR TEHSIL DISTT UDHAMPUR 182101 | UDHAMPUR | UDHAMPUR | JAMMU KASHMIR | 182101 | - | - | Rejected-Technical Not Recommended being two class below the eligible class |
| Sl No | Description | Qty | Unit | V S BUILDER L2 | MB Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Naubatram Vihar (08 Passenger & 13 Passenger- 40 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 6,00,000 ₹66,00,000 | 2,80,000 ₹30,80,000 Lowest |
| 2.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Albert Ekka Enclave area (08 Passenger & 13 Passenger - 36 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check & lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts & shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller & mains, Brake oil in dash pots. Check flexible leads to relay. Check & adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing & top up oil in gear box. | 11 | Per Month | 6,80,000 ₹74,80,000 | 2,34,000 ₹25,74,000 Lowest |
| 3.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Sansar chand Vihar Jib area (08 Passenger & 13 Passenger- 18 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 2,80,000 ₹30,80,000 | 1,25,000 ₹13,75,000 Lowest |
| 4.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Anant ram Vihar Jne area (08 Passenger & 13 Passenger- 16 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 2,60,000 ₹28,60,000 | 1,10,000 ₹12,10,000 Lowest |
| 5.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Tushar Vihar & Old Medical Complex (08 Passenger & 13 Passenger- 04 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 60,000 ₹6,60,000 | 30,000 ₹3,30,000 Lowest |
| 6.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Ashok Vihar (13 Passenger- 01 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 15,000 ₹1,65,000 | 8,500 ₹93,500 Lowest |
| 7.00 | Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift (G+1) at New Command Hospital Northern Command (08 Passenger- 01 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box. | 11 | Per Month | 15,000 ₹1,65,000 | 7,500 ₹82,500 Lowest |
| 8.00 | Description all as per Srl item No 7 here in before but for (G+5) at New Command Hospital Northern Command, 02 Nos, JCO/OR Accn 02 Nos, Single Offrs Accn (08 Passenger- 06 Nos) | 11 | Per Month | 32,000 ₹3,52,000 Lowest | 50,000 ₹5,50,000 |
| 9.00 | Description all as per Srl item No 7 here in before but for (G+4) with M/c Room at New Command Hospital Northern Command - 02 (20 Passenger- 02 Nos) | 11 | Per Month | 32,000 ₹3,52,000 | 20,000 ₹2,20,000 Lowest |
| 10.00 | Description all as per Srl item No 7 here in before but for (G+2) at New Command Hospital Northern Command - 02 (26 Passenger- 02 Nos) | 11 | Per Month | 32,000 ₹3,52,000 | 20,000 ₹2,20,000 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.3 L
Closing Date
29 Oct 2025, 6:00 pmClosed
Col Neelima CWE
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
REPAIR/MAINT OF ELECTRIC OPERATED LIFT/ELEVATOR AT CHNC NEW COMPLEX, ASHOK VIHAR, TUSHAR VIHAR, ANANT RAM, SANSAR CHAND VIHAR, OLD MEDICAL COMPLEX NAUBAT RAM VIHAR AND ALBERT EKKA ENCLAVE UNDER GE (UTILITIES) UDHAMPUR
2025_MES_727128_2
CWE/U(U)-42/2025-26
Open Tender
Miscellaneous Works
Item Rate
330 days
UDHAMPUR
AS PER NIT
6 documents required · 6 mandatory
₹1,000
GE (UTILITIES) UDHAMPUR
₹2.3 L
26 Dec 2025
16 Oct 2025
31 Oct 2025
16 Oct 2025
29 Oct 2025
23 Oct 2025
Amount
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Naubatram Vihar (08 Passenger & 13 Passenger- 40 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Albert Ekka Enclave area (08 Passenger & 13 Passenger - 36 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check & lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts & shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller & mains, Brake oil in dash pots. Check flexible leads to relay. Check & adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing & top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Sansar chand Vihar Jib area (08 Passenger & 13 Passenger- 18 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Anant ram Vihar Jne area (08 Passenger & 13 Passenger- 16 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Tushar Vihar & Old Medical Complex (08 Passenger & 13 Passenger- 04 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Ashok Vihar (13 Passenger- 01 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift (G+1) at New Command Hospital Northern Command (08 Passenger- 01 Nos) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Description all as per Srl item No 7 here in before but for (G+5) at New Command Hospital Northern Command, 02 Nos, JCO/OR Accn 02 Nos, Single Offrs Accn (08 Passenger- 06 Nos)
Description all as per Srl item No 7 here in before but for (G+4) with M/c Room at New Command Hospital Northern Command - 02 (20 Passenger- 02 Nos)
Description all as per Srl item No 7 here in before but for (G+2) at New Command Hospital Northern Command - 02 (26 Passenger- 02 Nos)
Description all as per Srl item No 7 here in before but for (G+2) with M/c Room at New Command Hospital Northern Command - 02 (26 Passenger- 01 Nos)
Description all as per Srl item No 7 here in before but for (G+5) with M/c Room at New Command Hospital Northern Command - 04 (26 Passenger- 06 Nos)
Notes for items No. 1 to 12 Brake :- Clean if oil and trace source of oil leakage. Adjust clearance between shoes and drum, clean contacts, check tape safety switch, lubricate shaft bearing, Check tape safety switch. Governor: Check that the leavers work smoothly, check that electrical contactgs opens before the rope gets locked. Ropes:- Check condition of hoist ropes and governpr ropes, Check slack rope if too dry, Hoist way:, Lubricate guides and shoes, check that the buggesrs are in porper position and measure and record counter weight buffer cleans with car at the top. Retring car and locks: Check operation of car an lock from the top at each leanding, check that retiring car solenoid is not getting over heated and that movement of car is smooth, check all the locks are functioning properly machanicllay and electrically after opening the covers Check all sets screws and springs and replace if necessary the lever should lock the brake properly.
Notes for items No. 1 to 12 (contd....):- check that the retiring car does touch the lock roller at the landing which is being passed, check that car gate switch operated properly, check condition of traveling cable and termination at junction boxes, check guide clamps and adjust, after physical inspection, get the lift to over travel by holding from the controller and see that the switches operate properly, check door closer safety, clean and adjust, if necessary, lubricate top track and door motor and linkage, check that landing doors can be opened by emergency keys. Machine room: Check and adjust overload relay and phase failure relay, check power wiring termination in switch, motor , controller and power switching relays, check lubricants of all equipments.
(i) Notes for items No. 1 to 12 (contd....): The Lowest Bidder will submit MOU on the stamp paper of Rs. 100 as per specified performa given by the deptt from the OEM i.e M/s Thyssenkrupp Elevator India Pvt Ltd, Omega and Kone within fifteen days of AOC for 11 months, failing which the contract shall be liable for cancellation & further action shall be taken as per the policy in vogue against the defaulter. (ii) The contractor will conclude AMC with OEM and copy of the Agreement alongwith tax invoice will be submitted to the Engineer-in-Charge and GE before commencement of AMC, no payment will be made to the contractor without submission of valid AMC agreement. (iii) The material likely replace for maint of the lift i.e. Lop/LCU, Cop/CCU, MCV, Landing Door Shoe, Contracts, Car Door Shoe, Coupler Door Motor, Drive Door, Trailing Cable, Buttons, Spring Landing Doorm, Roller, Relays, Main Drive, Rectifier, SMPS, CTU, Alarm PCB, Single PhaseePreventor, VVVF Drawing,COP/Deisplay, Sensor, Limit Switch, Read Switch, Read Switch, Stop Switch, COP/LOP etc. will be measure separately as per respective item of schedule.
Notes for items No. 1 to 12 (contd....): (iv) The Contractor has to carry out the repair/maintenance of the Lifts through OEM only. (v) The repair/maintenance should cover any/all parts of Lifts if its fucntions found defective the same should be repaired or replaced by the OEM as per the timeline covered under norms. (vi) One mechanic shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift. (vii) Rewinding of motor if required will be done by the contractor and no extra cost will be given by the department. (viii) The detailed lift mechanics of the firm shall report to the JE Concerned at the Lift complaint cell for receiving the complaints at round the clock daily including sunday and holiday. (ix) The detailed lift mechanics shall sign ( Their shift wise) in the attendence register kept with lift cell. (x) Cost of minor spare parts / routine material required for above mentioned maintenance is deemed to be included in the quoted rate except items mentioned here-in-after. No additional cost of spares is admissible for the above maintenance. Decision of the Accepting Officer shall be final & binding regarding minor spares/ routine material.
Notes for items No. 1 to 12 (contd....) (xi) Monthly schedule for proper maintenance of lift and necessary documentation including all spare parts required to be replaced during the period shall be as directed by Engineer-in-Charge. (xii) All minor spare parts and parts required for repair / replacement for maintenance of lifts to be replaced during repair/maintenance at no extra payment. (xiii) A Engineer/ Senior technician should be deployed round the clock to ensure the continuous and safe operation of the lift system timely. Also rectyify the fault in case of any kind of beakdown at any time for the safety of passengers / patients will be occure / erupt in the MH and Md Accn in such way. (a) Every five lift deploy only one Engineer/ Technician in CHNC. (b) Every twenty five lift deploy one Engineer/ Technician in Md Accn.
Taking down induction Motor(Traction Machine 9 KW,Gear Ratio; 49:1,Traction sheave Spec ɸ 620 x 5x ɸ 13) from foundation to machine room of lift by disconnecting electrically and mechanically, loading / inculding transporting to workshop for repair rewinding with ISI marked copper winding wire of existing gauge /size ISI marked insulating paper, varnish, replacement of bearings two Nos. of DE and NDE etc transporting back the motor after repairs, installing on foundation, aligning the same reconnecting electrically and mechanically and testing on Full load for satisfactory functioning complete all as specified and directed.
Taking down induction Motor(Traction Machine 5.5 KW,Gear Ratio; 49:1,Traction sheave Spec ɸ 620 x 5x ɸ 13) from foundation to machine room of lift by disconnecting electrically and mechanically, loading / inculding transporting to workshop for repair rewinding with ISI marked copper winding wire of existing gauge /size ISI marked insulating paper, varnish, replacement of bearings two Nos. of DE and NDE etc transporting back the motor after repairs, installing on foundation, aligning the same reconnecting electrically and mechanically and testing on Full load for satisfactory functioning complete all as specified and directed.
S&F in replacement of Landing door shoe of lift, make as per sample complete all as specified and directed.
S&F in replacement of Door motor of lift, make as per sample complete all as specified and directed.
S&F in replacement of Door open drive of lift, make as per sample complete all as specified and directed.
S&F in replacement of Trailing cable of lift, make as per sample complete all as specified and directed.
S&F in replacement of Push button of lift, make as per sample complete all as specified and directed.
S&F in replacement of Spring Landing door of lift, make as per sample complete all as specified and directed.
S&F in replacement of roller of lift, make as per sample complete all as specified and directed.
S&F in replacement of Relays of lift, make as per sample complete all as specified and directed.
S&F in replacement of Rectifier of lift, make as per sample complete all as specified and directed.
S&F in replacement of Cabin Display of lift , make as per sample complete all as specified and directed.
S&F in replacement of Cabin light of 9 watt of lift , make as per sample complete all as specified and directed.
S&F in replacement of Blower fan 300 mm heavy duty suitable for AC 230 Volt of lift , make as per sample complete all as specified and directed.
S&F in replacement of APC/UPS with battery 12 volt 18 Ah, Model 3000 VA, make as per sample complete all as specified and directed.
S&F in replacement of Battery 12 Volt, 18 Ah / 7 Ah of lift , make as per sample complete all as specified and directed.
S&F in replacement of Landing circuit Unit ((LOP/LCU) of lift, make as per sample complete all as specified and directed.
S&F in replacement of Main Circuit Board (MCU) of lift, make as per sample complete all as specified and directed.
S&F in replacement of Main drive of lift, make as per sample complete all as specefied and directed.
S&F in replacement of Car door shoe of lift, make as per sample complete all as specified and directed.
S&F in replacement of Door sensor for cabin as per sample complete all as specefied and directed.
S&F in replacement of Brake liner of lift, make as per sample complete all as specefied and directed.
S&F in replacement of Brake sensor of lift, make as per sample complete all as specefied and directed.
S&F in replacement of tensioning device of lift, make as per sample complete all as specefied and directed.
S&F in replacement of Rope Gripper of lift, make as per sample complete all as specified and directed.
S&F in replacement of Brake coil of lift, make as per sample complete all as specefied and directed.
S&F in replacement of Rope of lift, make as per sample complete all as specefied and directed.
S&F in replacement of Transformer Ratio(TRF) 110 Volt to 230 volt of lift , make as per sample complete all as specefied and directed.
S&F in replacement of door safety relays , make as per sample complete all as specefied and directed.
S&F in replacement of inspection switch of lift , make as per sample complete all as specefied and directed.
S&F in replacement of line choke of lift , make as per sample complete all as specefied and directed.
S&F in replacement of Car door belt , make as per sample complete all as specefied and directed.
S&F in replacement of single phase priventer (SSP), make as per sample complete all as specified and directed.
S&F in replacement of 12 watt LED Bulb for maintenance duct, make as per sample complete all as specified and directed.
S&F in replacement of Switch Mode Power Supply unit (SMPS), make as per sample complete all as specified and directed.
S&F in replacement of Rescue/Emergency alarm system with speeker, make as per sample complete all as specefied and directed.
S&F in replacement of Landing door male female contact, make as per sample complete all as specified and directed.
M&L for carry out Servicing/ Calibration of APC/ UPS with Battery 12 Volt, 18 Ah, Model 3000 VA, make as per sample complete all as specified and directed.
S&F in replacement of electronic ATS, 100 Amps, 415V, 50/60Hz, l closing=3A/230V, l tripping=0.5A/230v for lift , make standard/L&T complete all as specefied and directed.
S&F in replacement of Main motor of lift, make as per sample complete all as specified and directed.
S&F in replacement of arrow for centerlift assembly of lift, make as per sample complete all as specified and directed.
S&F in replacement of resister of lift, make as per sample complete all as specified and directed.
S&F in replacement of over load module of lift, make as per sample complete all as specified and directed.
S&F in replacement of traveling cable of lift , make as per sample complete all as specefied and directed.
S&F in replacement of gearless MRL break assembly of lift, make as per sample complete all as specefied and directed.
S&F in replacement of landing display card of lift, make as per sample complete all as specified and directed.
S&F in replacement of call card of lift, make as per sample complete all as specified and directed.
S&F in replacement of pully of lift, make as per sample complete all as specified and directed.
S&F in replacement of lock lever center with conntect assembly of lift, make as per sample complete all as specified and directed.
S&F in replacement of over speed governor of lift, make as per sample complete all as specified and directed.
S&F in replacement of APC/UPS, capacity upto 1000 VA, make as per sample complete all as specified and directed.
S&F in replacement of PLC of lift, make as per sample complete all as specified and directed.
S&F in replacement of interlock limit switch of lift, make as per sample complete all as specified and directed.
S&F in replacement of contractor 50 Amp, 220V of lift, make as per sample complete all as specified and directed.
S&F in replacement of Encoder cable of lift, make as per sample complete all as specified and directed.
S&F in replacement of inductive sensor of lift, make as per sample complete all as specified and directed.
S&F in replacement of PLA relay of lift , make as per sample complete all as specefied and directed.
S&F in replacement of PG feed back card of lift, make as per sample complete all as specefied and directed.
S&F in replacement of door tension spring rope of lift, make as per sample complete all as specified and directed.
S&F in replacement of speech processor with speaker, make as per sample complete all as specified and directed.
M&L for carry out Servicing/ Calibration of APC/ UPS with Battery 12 Volt, 7Ah/18 Ah, Model 1000 VA, make as per sample complete all as specified and directed.
S&F in replacement of electronic CTU card of lift, make as per sample complete all as specified and directed.
Supply & Install the battery 12V, 150 Amp, complete all as specified and directed.
V S BUILDER (BID ID -3460544)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
2ndcall_42.pdf
Tender Documents • 1.55 MB
BOQ_823716.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .