| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 Cr+₹3.2 L (2.33%)Rejected-Finance NO 450 SENTAMIL NAGAR MELATHURAIYUR KANNAMANGALAM POST ILAYANGUDI SIVAGANGAI 630709 | SIVAGANGA | TAMIL NADU | 630709 | ₹1.4 Cr+₹3.2 L (2.33%) | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
19 May 2023, 3:00 pmClosed
Project Director
DRDA,Sivagangai
Sundaranadappu - patcherivilakku road to Mangudi Therkuvadi Road
2023_RDTN_308927_2
MGSMT_SVG_SVG DT_Pack_146
Open Tender
Civil Works - Roads
Item Rate
180 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
Yes
12 Jul 2023
5 May 2023
19 May 2023
5 May 2023
19 May 2023
5 May 2023
Amount
STRENGTHENING OF THE ROAD FROM SUNDARANADAPPU-PACHERI VILAKKU ROAD TO MANGUDI THERKUVADI ROAD KM 0/0 - 3/400 (R 22 PUR )
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM Patch work using 1 cum of 45mm IRC HBG metal and 0.33 cum of Gravel for blindage for including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM and HM stones
Kilo metre stone
Hecta metre stone
Provision for Name Board cum citizen board
Provision for 60cm Cautionary Sign Boards
Provision for 60cm Mandatory Sign Boards
Road Marking with Hot applied Thermoplastic compound with Reflectorising glass beads on Bituminous surface
Provision for Slab Culvert at Ch 920 5m Span
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 A for cutting side drain
Provision for kraft paper
Provision for Expansion Joint
Provision for weep hole pipe
Provision for Slab Culvert at Ch 2100 1.5m Span
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the co
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Refilling the basement with excavated earth other than sand complying the
Provision for kraft paper
Provision for Expansion Joint
Provision for weep hole pipe
Provision for Slab Culvert at Ch 2400 1.5m Span
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4 mix using 20mm Iss size hard granite broken metal from approved quarry including costand conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the co
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Refilling the basement with excavated earth other than sand complying the
Provision for kraft paper
Provision for Expansion Joint
Provision for weep hole pipe
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
TAMILARASAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .