Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance NA | L1 | Accepted-Finance ok | |
| 2 | L2₹5.2 L+₹1,761.12 (0.34%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹5.6 L+₹48,533.50 (9.41%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹5.8 L+₹63,406.01 (12.3%)Accepted-Finance | L4 | Accepted-Finance ok |
Tender Value
₹6.3 L
Closing Date
1 Jan 2022, 6:00 pmClosed
DFO Nowshera
DFO Nowshera
Construction of 109 No. of demarcation Boundary Pillars as per approved design at different locations according to tashree burjiat (description of boundary pillar) and as per latitude and longitude found out by GPS in Dharamsal Forest
2021_FD_152558_6
e-NIT-13 of 2021-22
Open Tender
Civil Works - Others
Item Wise
45 days
Dharamsal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DFO Nowshera
Exempted
11 Jan 2022
27 Dec 2021
3 Jan 2022
27 Dec 2021
1 Jan 2022
27 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, Depth/ heightupto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed 80% dense harder soil and 20 % ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed Including all leads lift carriage complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size Including all leads lift carriage complete job
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size Including all leads lift carriage complete job
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
SUMEET SAMBYAL CONTRACTOR
Zaker Hussain
M/S ROSHAN LAL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .