| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC 0 BHUJAULI SISWA BAZAR MAHARAJGANJ MAHARAJGANJ UTTAR PRADESH 273163 | MAHARAJGANJ | UTTAR PRADESH | 273163 | ₹4.1 Cr | L1 | Accepted-AOC THIS IS L1 ACCEPTED |
| 2 | L2₹4.2 Cr+₹6.2 L (1.51%)Rejected-Finance | ₹4.2 Cr+₹6.2 L (1.51%) | L2 | Rejected-Finance THIS IS L2 SO REJECTED |
| 3 | L3₹4.4 Cr+₹30.1 L (7.29%)Rejected-Finance | ₹4.4 Cr+₹30.1 L (7.29%) | L3 | Rejected-Finance THIS IS L3 SO REJECTED |
| 4 | L4₹4.5 Cr+₹33.8 L (8.19%)Rejected-Finance 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | ₹4.5 Cr+₹33.8 L (8.19%) | L4 | Rejected-Finance THIS IS L94 SO REJECTED |
| 5 | L5₹4.5 Cr+₹34.3 L (8.32%)Rejected-Finance 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | ₹4.5 Cr+₹34.3 L (8.32%) | L5 | Rejected-Finance THIS IS L5 SO REJECTED |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
27 Jan 2024, 12:00 pmClosed
SUPERINTENDING ENGINEER VNS CIRCLE PWD VARANASI
SUPERINTENDING ENGINEER VNS CIRCLE PWD VARANASI
Widening and strengthening work of Lucknow Varanasi NH-56 km 263 road to Baragaon road in Varanasi district.
2024_CEUVZ_883313_1
101/183COM-VARANASI CIRCLE/23-24 DT. 06.01.2024
Open Tender
Civil Works - Roads
Item Wise
366 days
Varanasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹10.6 L
Yes
SUPERINTENDING ENGINEER VNS CIRCLE PWD VARANASI
14 Mar 2024
20 Jan 2024
27 Jan 2024
20 Jan 2024
27 Jan 2024
20 Jan 2024
20 Jan 2024
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST .
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(with Cartage) .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Scarifying the existing bituminous surface to a depth of 20 mm and disposal of scarified material within all lifts and leads upto 1000 metres. .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete. as per sor ITEM No 251..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Concrete with 4cm. gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work.as per sor ITEM No 275.Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
M-150 brick work in 1:6 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. As in item 303 above but in 1:4 cement and coarse sand mortar..as per sor ITEM No 305 B .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work..as per sor ITEM No 574 ..Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
12mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 F.M. over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work.as per sor ITEM No 582 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Supply of hume pipe with coller(900mm dia) .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete.as per item 251 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work.as per item 280 .Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
Cement concrete with 4cm. gauge approved stone ballast, approve coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. As in Item No. 287 above but with 1:1.1/2:3 as per item 287 B
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. as per SOR Item no 504.Including all material, labour, T&P, labour cess etc all taxes etc but Excluding GST
JAI SHAKTI CONSTRUCTION
M/s Paras International
M/S YASH CONSTRUCTION
M/S G S COATINGS
RAJ INFRATECH
MS JWALAMUKHI CONSTRUCTION
M/S NANDAN CONSTRUCTION
J.P.ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .