Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹16.7 L+₹36,800 (2.25%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹19.0 L+₹2.6 L (15.7%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹19.5 L+₹3.1 L (19.1%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹21.1 L+₹4.7 L (28.7%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹21.3 L
EMD Value
₹43,000
Closing Date
22 Dec 2020, 6:00 pmClosed
CWE Jammu
HQ CWE Jammu Pin 900172 C/o 56 APO
SPECIAL REPAIR FOR REPLACEMENT OF CEILING FANS AT SUNJUWAN UNDER GE JAMMU
2020_MES_397408_1
CWE/JP-67/2020-21
Open Tender
Support/Maintenance Service
Item Rate
180 days
AOR GE Jammu
Class E, Cat b(i)
9 documents required · 9 mandatory
₹500
Yes
G E Jammu
₹43,000
Yes
27 Jan 2021
23 Nov 2020
29 Dec 2020
23 Nov 2020
22 Dec 2020
8 Dec 2020
Amount
Ceiling Fan (Cristal White) ISI marked of size 1200mm sweep, 240 volts, 50 Hz, 3 blade of 5 star rating complete including connecting flexible coper conductor three core from connector to ceiling rose, AC single phase 240 volts, complete all as specified and directed. Note :- The flexible wire shall be measured and paid saparatly in the respective item of this schedule.
Supply only flexible wire (copper conductor) of size 30/0.25mm, 3 core, complete all as specified and directed.
SUPER BUILDER
vishesh engineers
Dn construction and co
M/S INDERPAL SINGH
bamral builder
M/S Sukhmani Construction Co.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .