Tender Value
₹1.2 Cr
EMD Value
₹7.8 L
Closing Date
25 Sept 2026, 12:00 pm2d left
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Construction of Barapur bheekh sampark marg in FY 2026-27 (with five years maintenance as per attached SOP) under Mukhya Mantri Gramin Sadak Yojna (4)
2026_CEALD_1187362_4
3794/93C-ETENDERING/PFC/2026 DT. 24.08.2026
Open Tender
Civil Works
Fixed-rate
180 days
PRATAPGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7.8 L
Pratapgarh Circle, PWD, Pratapgarh
18 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m and lead upto 30 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300-2 as per technical specification clause 301.5.including labour cess.but excluding GST | 9,800 | Cum | 90 | ₹8,82,000 |
| 2 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement (OPC) @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase.including labour cess, royality.but excluding GST | 872.95 | Cum | 2,950 | ₹25,75,202.5 |
| 3 | Cement WBM Grading III / Providing, laying and spreading Material on a prepared sub base, cement (OPC) @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to acheive the desired unconfined compressive strength and to form a layer of sub base/base. Quantity of cement as 4 percent of quantity by weight for subbase.including labour cess, royality.but excluding GST | 828.75 | Cum | 4,110 | ₹34,06,162.5 |
| 4 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.as per MORD specificaiton no. 503.including labour cess, royality.but excluding GST | 8,287.5 | Sqm | 24 | ₹1,98,900 |
| 5 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.as per MORD specificaiton no. 508.including labour cess, royality.but excluding GST | 8,287.5 | sqm | 220 | ₹18,23,250 |
| 6 | Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .as per MORD specificaiton no. 510.including labour cess, royality.but excluding GST | 8,287.5 | sqm | 84 | ₹6,96,150 |
| 7 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per technical specification clause 301.5 .excluding royality. (excluding hire roller chargess).including labour cess.but excluding GST | 2,037.18 | Cum | 80 | ₹1,62,974.4 |
| 8Construction of NP-3 hume pipe culvert | |||||
| 8.1 | Earth work in excavation in foundation trenches or drains (not exccding 1.5 m. in width or 10sqm.on plan) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 30m.including labour cess.but excluding GST | - | Cum | 50 | - |
| 8.2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORD specifiaction no.802, 803, 1202 i/c suppy of all materials, labour T&P etc. for proper completion of work as per direction of E/I including labour cess, royality.but excluding GST | - | Cum | 6,620 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
T_24.pdf
Tender Documents • 7.67 MB
BOQ_2235654.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .