Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-AOC VILLAGE BHUSLANA TEHSIL SAFIDON DISTRICT JIND | JIND | HARYANA | 126101 | ₹2.9 Cr Quoted ₹3.2 Cr | L1 | Accepted-AOC Award |
| Sl No | Description | Qty | Unit | PARMOD KUMAR L1 |
|---|---|---|---|---|
| 1.00 | Credit for Steel, GI pipe and MS Angles etc. | 1 | Each | 5,000 ₹-5,000 Lowest |
| 2.00 | operation and maintenance for 1st year after defect liability period (12 months). | 12 | Per Month | 40,000 ₹4,80,000 Lowest |
| 3.00 | operation and maintenance for 2nd year after defect liability period (12 months). | 12 | Per Month | 50,000 ₹6,00,000 Lowest |
| 4.00 | operation and maintenance for 3rd year after defect liability period (12 months). | 12 | Per Month | 55,000 ₹6,60,000 Lowest |
| 5.00 | operation and maintenance for 4th year after defect liability period (12 months). | 12 | Per Month | 60,000 ₹7,20,000 Lowest |
| 6.00 | operation and maintenance for 5th year after defect liability period (12 months). | 12 | Per Month | 70,000 ₹8,40,000 Lowest |
| 7.00 | operation and maintenance for complete scope of work mentioned in DNIT as per schedule iv for a period of 5 year after 12 month of defect liability period and 3 month trial run period will be charged to annual maintenance estimate complete in all respect.
i) operation and maintenance during defect liability period after 3 month trial period (12 Months) ( operaion and Maintainece). | 12 | Per Month | 1,00,000 ₹12,00,000 Lowest |
| 8.00 | Providing, supplying, and fixing Manual Coarse Bar screen Channel Width: 900 mm, Channel Depth: 1500mm, Water Depth : 1000 mm, Bar Spacing : 20 mm, Bar Thickness: 10x50mm, Angle of Inclination: 60 Degree MOC : SS-304. | 2 | Each | 1,15,000 ₹2,30,000 Lowest |
| 9.00 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor panel with A/M change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, Including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M
switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA
sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated and synchronized with SCADA master control system of in
Village Bapoli. ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge. (designed for a 60HP,40HP,20HP HP non-clog submersible sewage pumps set with an additional 15% loading margin for safety) | 1 | Set | 1,65,000 ₹1,65,000 Lowest |
| 10.00 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor/outdoor panel with A/M (Auto Manual) change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, Digital Multifunction/Energy Meter, Hour Meter, Surge Protection device, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated with SCADA master control system ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge.(designed for 200 cum/hr and 35 m head. non clog submersible sewage pumps with an additional 25% loading margin for safety) For Pumps (2W plus 1S) | 1 | Set | 15,50,000 ₹15,50,000 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
14 May 2026, 6:00 pmClosed
VIKAS LATHAR
Panipat PHED No. 2
Construction of 2MLD Intermediate Pumping Station (IPS), Laying of DI Rising Main from Proposed IPS to STP, Construction of Treated Effluent Sump and Laying of DI Rising Main from STP to Drain No.2, Dismantling of Existing OHSR and Existing Pump Cham
2026_HRY_520159_1
20261CFEE69C 4BBB 45E9 AFAB C9459EEC3C6C574PUH
Open Tender
Civil Works
Works
365 days
BAPOLI
2 documents required · 2 mandatory
₹15,000
₹5.3 L
Yes
30 Jun 2026
7 May 2026
14 May 2026
7 May 2026
14 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Credit for Steel, GI pipe and MS Angles etc. | 1 | Each | 1 | ₹1 |
| 2 | operation and maintenance for 1st year after defect liability period (12 months). | 12 | Per Month | - | - |
| 3 | operation and maintenance for 2nd year after defect liability period (12 months). | 12 | Per Month | - | - |
| 4 | operation and maintenance for 3rd year after defect liability period (12 months). | 12 | Per Month | - | - |
| 5 | operation and maintenance for 4th year after defect liability period (12 months). | 12 | Per Month | - | - |
| 6 | operation and maintenance for 5th year after defect liability period (12 months). | 12 | Per Month | - | - |
| 7 | operation and maintenance for complete scope of work mentioned in DNIT as per schedule iv for a period of 5 year after 12 month of defect liability period and 3 month trial run period will be charged to annual maintenance estimate complete in all respect.
i) operation and maintenance during defect liability period after 3 month trial period (12 Months) ( operaion and Maintainece). | 12 | Per Month | - | - |
| 8 | Providing, supplying, and fixing Manual Coarse Bar screen Channel Width: 900 mm, Channel Depth: 1500mm, Water Depth : 1000 mm, Bar Spacing : 20 mm, Bar Thickness: 10x50mm, Angle of Inclination: 60 Degree MOC : SS-304. | 2 | Each | - | - |
| 9 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor panel with A/M change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, Including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M
switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA
sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated and synchronized with SCADA master control system of in
Village Bapoli. ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge. (designed for a 60HP,40HP,20HP HP non-clog submersible sewage pumps set with an additional 15% loading margin for safety) | 1 | Set | - | - |
| 10 | Providing, supplying, erecting, installing, testing, and commissioning of a multi-compartment LT Indoor/outdoor panel with A/M (Auto Manual) change over switch for DG and EB power source, independent feeders for pumps, PLC Control panel , field instruments, including Pump Monitoring Unit (PMU), UPS, for Pump operation VFD panel with a bypass switch and emergency Star/Delta starter, A/M switch for Auto control from PLC, Push buttons for manual operation, status indicating lamps, with reputed make contactors, Volt and Amp meters, Digital Multifunction/Energy Meter, Hour Meter, Surge Protection device, cables, MCBs etc. Motor control Panel - having required front surface area, fabricated in fully compartmentalized design from CRCA sheet steel of 2mm thick for frame work and covers, 3mm thick for gland plates i/c cleaning and finishing complete with 10 tank spray based tricationic phosphating treatment process for powder coating in approved shade, PU Foam Gasket without manual pasting, joint less (temperature withstand capacity - 40degC to plus 120degC) for maintaining IP protection, power capacitors etc., integrated with SCADA master control system ensuring the panel complete in all respects to the satisfaction of the Engineer-in-Charge.(designed for 200 cum/hr and 35 m head. non clog submersible sewage pumps with an additional 25% loading margin for safety) For Pumps (2W plus 1S) | 1 | Set | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_599049.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .