Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-Finance 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 1 | Accepted-Finance satisfied | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Due to EMD related issues |
Tender Value
₹1.6 L
EMD Value
₹1,700
Closing Date
2 Jul 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/M-II/MTPS-I
Superintending Engineer Mechanical-II Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I O AHS Unit III and IV Cutting and removal of eroded and damaged existing 150 NB
2021_EB_202991_1
SE M II MTPS I O AHS OT 46 2021 2022
Open Tender
Miscellaneous Works
Works
30 days
MTPS-I
As per Tender Specification
6 documents required · 6 mandatory
₹0
₹1,700
Yes
19 Jul 2021
17 Jun 2021
3 Jul 2021
17 Jun 2021
2 Jul 2021
17 Jun 2021
180 days
Amount
Charges for removal of concrete slabs/ Grill laid over the trench, transferring and positioning the same at nearby places as per the direction of Engineer in charge including lead, lift and transportation etc.
Charges for cutting and removal of existing worn out HP 150 NB MS ERW pipe line provided in the trench from BAH-III & IV to towards respective ESP for length of 50 mtrs/ unit including cost of consumables like cutting gas etc. and devolution of scrap to central stores/MTPS-I (Required lorry will be supplied by TANGEDCO at free of cost).
Charges for fabrication, erection and welding of new HP 150 NB MS ERW pipes including cost of consumables like cutting gas, welding electrode etc (Required MS ERW pipes will be supplied by TANGEDCO at free of cost)
Charges for fabrication of 90° MS bend suitable for 150 NB M.S. ERW pipe including cost of consumable like cutting gas, welding electrodes, cotton waste etc. (Required 150NB MS ERW pipe will be supplied by TANGEDCO at free of cost)
Charges for cutting and removing of eroded supports provided along the newly erected 150 NB pipe lines from trenches of BAH-III &IV to towards ESP (Required angles and channels, will be supplied by TANGEDCO at free of cost).
Charges for relaying the concrete slabs/ grill over the trench after completion welding work as per the direction of Engineer in charge including lead, lift and transportation and reconditioning the wornout grill as per site condition etc from BAH III & IV to towards ESP
Charges for painting of 100 Mtrs. length of newly erected 150 NB MS ERW pipe and supporting structures with one coat of red oxide paints and two coat of enamel grey paint including paint cost (on contractors scope), brushes, cotton waste and other consumables etc.,
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .