| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 L+₹2,073.16 (0.43%)Rejected-AOC 9998E OPP KAMARAJ POLYTECHNIC COLLEGE PAZHAVILAI | ₹4.8 L+₹2,073.16 (0.43%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.6 L+₹74,358.50 (15.5%)Rejected-AOC | ₹5.6 L+₹74,358.50 (15.5%) | L3 | Rejected-AOC L3 |
| 4 | L4₹6.3 L+₹1.5 L (30.7%)Rejected-AOC | ₹6.3 L+₹1.5 L (30.7%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | L.Johnson L4 | GREEN FARM AGENCIES L2 | S SRINIVASAN(WORKS CONTRACTOR) L1 | Joseph sahaya Selvam L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 9.7 | M3 | 300 ₹2,910 | 284.37 ₹2,758.39 | 190.35 ₹1,846.4 Lowest | 230 ₹2,231 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 8.3 | M3 | 5,750 ₹47,725 | 4,387.5 ₹36,416.25 Lowest | 4,400 ₹36,520 | 5,000 ₹41,500 |
| 3.00 | Brick work in Cement Mortar 1:5 (one cement and five crushed stone sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. For Foundation and Basement. | 3.75 | M3 | 6,800 ₹25,500 | 5,707.81 ₹21,404.29 | 5,200 ₹19,500 Lowest | 6,200 ₹23,250 |
| 4.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 50mm thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | 2.8 | M2 | 600 ₹1,680 | 5,378.75 ₹15,060.5 | 472 ₹1,321.6 Lowest | 500 ₹1,400 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire). Upto Basement / Plinth level | 0.15 | Qtl | 10,000 ₹1,500 | 7,553.95 ₹1,133.09 | 7,450 ₹1,117.5 Lowest | 9,000 ₹1,350 |
| 6.00Supplying and fixing following dia of rectangular GI Square / Rectangular pipe for Purlins including labour charges for cutting, welding and fixing with A.C. Sheet roofing etc., as directed by the departmental officers | |||||||
| 6.01 | 4'' x 2'' size (100 x 50 mm) | 5 | R.M. | 350 ₹1,750 | 251.87 ₹1,259.35 | 160 ₹800 Lowest | 300 ₹1,500 |
| 6.02 | 2'' x 2'' size (50 x 50 mm) | 23.7 | R.M. | 300 ₹7,110 | 235.62 ₹5,584.19 | 138.5 ₹3,282.45 Lowest | 280 ₹6,636 |
| 7.00 | Supplying and fixing Galvalume colour sheet roofing with 0.47mm thick thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed by the departmetal officers | 8.85 | M2 | 1,100 ₹9,735 | 882.37 ₹7,808.97 | 878.74 ₹7,776.85 Lowest | 1,000 ₹8,850 |
| 8.00 | Supplying and fixing in position best quality PVC soil / waste pipes of 160mm dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation,sand filling and refilling charges etc. will be measured and paid separately in the cases where the pipe lines are proposed to laid Above/below Ground Level. | 5 | R.M. | 900 ₹4,500 | 617.58 ₹3,087.9 Lowest | 660 ₹3,300 | 800 ₹4,000 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
31 Jul 2026, 3:00 pmClosed
Executive Engineer, PWD.,
Building Construction and Maintenance Division, Nagercoil
Working estimate for Providing Name board, Fire Extinguisher and other amenities pertaining to the main building of Government Higher Secondary School at Kumarapuram Thoppur in Kanniyakumari District.
2026_PWD_686316_1
e-Tender Notice No. 1(3) / C.8.1 / 229M / 2026-27 Dt.14.07.2026
Open Tender
Civil Works - Buildings
Lump-sum
Kumarapuram Thoppur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
21 Aug 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 9.7 | M3 | 235.27 | ₹2,282.12 |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 8.3 | M3 | 5,216.32 | ₹43,295.46 |
| 3 | Brick work in Cement Mortar 1:5 (one cement and five crushed stone sand) using best quality Burnt Clay Brick of size 8 3/4" x 4 1/4" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. For Foundation and Basement. | 3.75 | M3 | 6,390.18 | ₹23,963.18 |
| 4 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 50mm thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | 2.8 | M2 | 580.2 | ₹1,624.56 |
| 5 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire). Upto Basement / Plinth level | 0.15 | Qtl | 9,297.18 | ₹1,394.58 |
| 6Supplying and fixing following dia of rectangular GI Square / Rectangular pipe for Purlins including labour charges for cutting, welding and fixing with A.C. Sheet roofing etc., as directed by the departmental officers | |||||
| 6.01 | 4'' x 2'' size (100 x 50 mm) | 5 | R.M. | 310 | ₹1,550 |
| 6.02 | 2'' x 2'' size (50 x 50 mm) | 23.7 | R.M. | 290 | ₹6,873 |
| 7 | Supplying and fixing Galvalume colour sheet roofing with 0.47mm thick thick of approved quality by drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of suitable length and providing one set of bitumen washers of 25mm dia and 1.60mm thick for each bolt including protruding portion of bolts in roof shall be covered with bitumen compound etc., complete complying with standard specification and as directed by the departmetal officers | 8.85 | M2 | 1,086.19 | ₹9,612.78 |
| 8 | Supplying and fixing in position best quality PVC soil / waste pipes of 160mm dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC / MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry / RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the Executive Engineer before use on works). The rate for earth work excavation,sand filling and refilling charges etc. will be measured and paid separately in the cases where the pipe lines are proposed to laid Above/below Ground Level. | 5 | R.M. | 813.89 | ₹4,069.45 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_824997.xls
BOQ • 0.34 MB
TD600Kumarapuram.pdf
Tender Documents • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .