Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
27 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2026_PVVNV_1194471_1
67/SE/EUDC-I-PRA/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
Arail
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Account Number-0012002100504911
₹6,500
8 Oct 2026
8 Oct 2026
27 Oct 2026
8 Oct 2026
27 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Arail area during year 2026-27, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion. | |||||
| 1 | Construction of Temporary 11 KV overhead Line from nearest 11 kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 6 No. latching per span) and its earthing. | 0.05 | Ckt. Km. | - | - |
| 2 | Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion. | 0.05 | Ckt. Km. | - | - |
| 3 | Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area. | 70 | Mtr | - | - |
| 4 | Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor) | 2 | No | - | - |
| 5 | Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini. | 0.05 | Ckt. Km. | - | - |
| 6 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. | 1 | No | - | - |
| 7 | Construction of double pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/angles/G.O ,plinthing and earthing etc., as per requirement. | 1 | job | - | - |
| 8 | Construction of double pole for 100 KVA Substation on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles,D.O.,G.O.,painting and earthing etc.Installation of 100 KVA Transformer on DP, earthing of transformer body and neutral. alongwith dismantling after completion of Mela period. | 1 | No | - | - |
| 9 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer. | 1 | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_2255016.xls
BOQ • 0.30 MB
T-No-67 Arail VIP Visit.docx
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .