Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84.4 LAccepted-AOC GRAM ROMI PADMA HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | 1 | Accepted-AOC Lower bid | |
| 2 | 2₹86.4 L+₹1.9 L (2.29%)Rejected-Finance BARA BAZAR SUBHASH MARG HAZARIBAG JHARKHAND | HAZARIBAGH | JHARKHAND | 825301 | 2 | Rejected-Finance Higher bid | |
| 3 | 3₹86.4 L+₹2.0 L (2.32%)Rejected-Finance | 3 | Rejected-Finance Higher bid | |
| 4 | 4₹91.2 L+₹6.8 L (8.00%)Rejected-Finance BUNDEL NAGAR SARLE NEAR JHARKHAND POLICE ACADEMY HAZARIBAG JHARKHAND INDIA | HAZARIBAGH | JHARKHAND | 825301 | 4 | Rejected-Finance Higher bid | |
| 5 | 5₹91.3 L+₹6.8 L (8.06%)Rejected-Finance GRAM PUNAI DARU HAZARIBAGH | 5 | Rejected-Finance Higher bid |
| Sl No | Description | Qty | Unit | INDRADEV PURUSHOTTAM CONSTRUCTION PRIVATE LIMITED L5 | OMNESH CONSTRUCTION AND DEVELOPERS PVT. LTD. L4 | M/S KRISHNA CHOURASIA CONSTRUCTION L2 | INDRAJEET KUMAR L1 | PARVIN KUMAR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down old door and window shutters including stacking serviceable materials within 15M,. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 99 | NO | 45.12 ₹4,466.88 | 45.12 ₹4,466.88 | 100 ₹9,900 | 41.73 ₹4,131.37 Lowest | 105 ₹10,395 |
| 2.00 | Taking down chaukhats in doors including stacking serviceable materials within 15M,. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 44 | NO | 89.88 ₹3,954.72 | 89.88 ₹3,954.72 | 100 ₹4,400 | 83.13 ₹3,657.72 Lowest | 100 ₹4,400 |
| 3.00 | Taking sown chaukhats in windows including stacking serviceable materials within 15M,. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I | 55 | NO | 138.07 ₹7,593.85 | 138.07 ₹7,593.85 | 100 ₹5,500 Lowest | 127.7 ₹7,023.56 | 100 ₹5,500 Lowest |
| 4.00 | Dismantling patent stone floor including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 344.66 | M2 | 40.75 ₹14,045.02 | 40.75 ₹14,045.02 | 60 ₹20,679.78 | 37.69 ₹12,990.35 Lowest | 60 ₹20,679.78 |
| 5.00 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 2,409.74 | M2 | 21.46 ₹51,712.96 | 21.46 ₹51,712.96 | 20 ₹48,194.74 | 19.85 ₹47,828.46 Lowest | 20 ₹48,194.74 |
| 6.00 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I | 10.89 | M3 | 1,993.04 ₹21,704.21 | 1,993.04 ₹21,704.21 | 1,000 ₹10,890 Lowest | 1,843.36 ₹20,074.22 | 1,000 ₹10,890 Lowest |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 5.5 | M3 | 4,961.73 ₹27,289.52 | 4,961.73 ₹27,289.52 | 5,500 ₹30,250 | 4,589.1 ₹25,240.07 Lowest | 5,500 ₹30,250 |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 12.56 | M3 | 5,525.28 ₹69,397.52 Lowest | 5,525.28 ₹69,397.52 Lowest | 6,200 ₹77,872 | 5,835.07 ₹73,288.53 | 6,200 ₹77,872 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Weather shade, Chajjas, corbels etc., including edges | 146.52 | M2 | 445.55 ₹65,281.99 | 445.55 ₹65,281.99 | 360 ₹52,747.2 Lowest | 412.09 ₹60,379.28 | 360 ₹52,747.2 Lowest |
| 10.00 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing | 1.17 | MT | 67,514 ₹78,991.38 | 63,855 ₹74,710.35 Lowest | 76,000 ₹88,920 | 77,057.14 ₹90,156.85 | 76,000 ₹88,920 |
Tender Value
₹91.3 L
EMD Value
₹1.8 L
Closing Date
6 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE BCD BUILDING DIVISION,HAZARIBAG
Office of the Executive Engineer, Building Construction Department, Building Division, Hazaribag
Repair of A Ward Cottage(67 to 77) at open Jail , Hazaribag in the District of Hazaribag
2025_BCD_100702_1
BCD/EE/HAZARIBAG/06/06/2025-26
Open Tender
Civil Works
Item Rate
180 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.8 L
28 Nov 2025
29 Apr 2025
7 May 2025
29 Apr 2025
6 May 2025
29 Apr 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .