Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.2 LAccepted-AOC | ₹8.2 L | 1 | Accepted-AOC qualified |
| 2 | Not Admitted-Fee/PreQual/Technical 1 1 PANJETTY PANJETTY POST TIRUVALLUR TAMIL NADU 601204 | THIRUVALLUR | TAMIL NADU | 601204 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M.MARIYAMMAL L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the existing Cement Concrete with Surgaee including all labour charege etc | 120 | M3 | 62,400 ₹62,400 |
| 2.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including using 45mm to 22.4mm 0.396 cum, 22.40mm to 2.36mm of 0.528cum, 2.3mm of 0.396cum premixing the materialwith water at OMC in mechanical mix plant carriage for mixed material by tipper to site laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORTH specifications. as per standard specifications etc., completed | 90 | M3 | 2,16,270 ₹2.2 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 600 | M2 | 47,400 ₹47,400 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 600 | M2 | 10,800 ₹10,800 |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 30 | M2 | 2,91,090 ₹2.9 L |
| 6.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP ith bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory /Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 18 | M3 | 1,88,748 ₹1.9 L |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
11 Nov 2025, 3:00 pmClosed
EXECUTIVE OFFICER
EDAIKAZHINADU TOWN PANCHAYAT
Providing to B.T.Road at Ward No.09 Gengadevankuppam middle school Salai in Edaikazhinadu Town Panchayat, Chengalpattu District
2025_DTP_621445_1
198/2024
Open Tender
Civil Works
EDAIKAZHINADU TOWN PANCHAYAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
22 Apr 2026
8 Nov 2025
12 Nov 2025
8 Nov 2025
11 Nov 2025
8 Nov 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
4.19 MB
Document
0.88 MB
BOQ
BOQ • 0.27 MB
Download all tender documents and submit your bid