| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC | ₹44.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹44.4 LRejected-Finance | ₹44.4 L | L2 | Rejected-Finance The Above the Tenderis PS Karthikeyan contractor |
| Sl No | Description | Qty | Unit | Dhaya Karthikeyan L2 | SH Constructions L1 |
|---|---|---|---|---|---|
| 1.01CONSTRUCTION OF HSC BUILDING AT KALNATTUR PUDUR IN PUDURCHEKKADI PANCHAYAT | |||||
| 1.02Clearing jungle including uprooting of trunk vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | |||||
| 1.03 | Clearing jungle including uprooting of trunk vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 195 | Cum | 5 ₹975 | 5 ₹975 |
| 1.04 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 169.82 | Cum | 246 ₹41,775.72 | 246 ₹41,775.72 |
| 1.05 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 22.3 | Cum | 1,584 ₹35,323.20 | 1,584 ₹35,323.20 |
| 1.06 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 46.95 | Cum | 5,146 ₹2.4 L | 5,146 ₹2.4 L |
| 1.07 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 94.47 | Cum | 42 ₹3,967.74 | 42 ₹3,967.74 |
| 1.08Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 1.09 | Upto Basement | 199.84 | Cum | 516 ₹1.0 L | 516 ₹1.0 L |
| 1.10 | Ground Floor | 262.25 | Cum | 1,033 ₹2.7 L | 1,033 ₹2.7 L |
Tender Value
₹45 L
EMD Value
₹45,000
Closing Date
28 Jul 2025, 3:00 pmClosed
Block Development Office (B.P) Thandarampet
Block Development Office (B.P) Thandarampet 606707
CONSTRUCTION OF NEW HEALTH SUB CENTER BUILDING IN PUDUR CHEAKKADI PANCHAYAT AT THANDARAMPET block in Tiruvannamalai District Under 15th Finance Commision(Health Grants) - 2025-26
2025_RDTN_584279_1
A6/2200/2025/TVMTPET000026
Open Tender
Civil Works - Buildings
180 days
Thandarampattu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹45,000
21 Dec 2025
22 Jul 2025
28 Jul 2025
22 Jul 2025
28 Jul 2025
22 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf