| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC NOT APPLICABLE | FARIDABAD | HARYANA | 121004 | ₹1.8 Cr | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹1.9 Cr+₹9.2 L (5.01%)Rejected-AOC | ₹1.9 Cr+₹9.2 L (5.01%) | L2 | Rejected-AOC High rates |
| 3 | L3₹2.0 Cr+₹18.5 L (10.1%)Rejected-AOC 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹2.0 Cr+₹18.5 L (10.1%) | L3 | Rejected-AOC High rates |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
30 Sept 2024, 9:30 amClosed
Executive Engineer Lehal Canal Division Patiala
Executive Engineer Lehal Canal Division WRD Punjab Patiala
Estimate for Relining of Bhagwanpura Disty. Sysytem (Concrete Lining M-15) With 10 percent enhanced capacity from RD 0-87980 offtaking at RD 90200/R 2nd Patiala Feeder RD 63850-87980
2024_WR_126396_5
08 dated 30.08.2024
Open Tender
Civil Works - Canal
Item Rate
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹3.5 L
Yes
21 Nov 2024
16 Sept 2024
30 Sept 2024
16 Sept 2024
30 Sept 2024
16 Sept 2024
Amount
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 1.5 cum/s including boundary road :-
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) (a) 0-1.5mt. Depth
Dressing of Earth work ( NEW )
Dismantaling of old lining and brick work in cement sand mortar.
Dressing and preparation of sub grade for side slopes.
Providing and laying Cement concrete (M-15) sleepers in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications
Filling of construction joints sealing compound including supply carriage, of material complete in all respect as per design/drawing and PWD specifications
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications
Providing and laying LDEP 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Extra for Bitumen Painting @ 0.69 kg per Sqmt.
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
Ordinary distance marks (km stone) after every 1000 feet interval
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige from 0 upto 450m
(a) 450m upto 1Km (pacca)
(b) 450m upto 1Km (katcha)
(d) 1 km to 10 km ( pacca)
(e) 1 km to 10 km ( katcha)
Plain/Reinforced cement concrete M25 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications
PlainlReinforced cement concrete (RCC Grade M30 ) in sub-structure complete as per drawing and MORT&H MoRT&H Specifications 1500,1700 and 2200 With Batching Plant, Transit Mixer and Concrete Pump Height up to 5m
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H Specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRT&H Specifications
PCC M15 Grade levelling course below approach slab complete as per drawing and MoRT&H MoRT&H specification clause 2700
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -33022/1/94-DO Ill dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified (CSR item 22.12 A)
Painting New letters and figures on black synthetic enamel paint to an even shade on surface
Back filling behind abutment, wing wall and return wall using granular material complete as per drawing and Technical Specification
BRIDGES - SUPER STRUCTURE & PROTECTION WORK Reinforced cement concrete approach slab using M-30 grade concrete , including reinforcement and formwork complete as per drawing and Technical specification
PlainlReinforced cement concrete (RCC Grade M30 ) in sub-structure complete as per drawing and MORT&H MoRT&H Specifications 1500,1700 and 2200 With Batching Plant, Transit Mixer and Concrete Pump Height up to 5m. For wearing coat
Plain/Reinforced cement concrete Grade M20 in foundation and plinth complete as per drawing and Technical Specifications
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete M-25 Cement mixed in Computerized Batching and Mixing Plant and Transported to site in Transit Mixers to site with an average lead 1 km. but excluding vibrator, steel reinforcement, centering and shuttering in Sub-structure
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical Specifications.
Earth Work involved in dismantling of outlet ’H’ upto 0.50mt.
Dismantling of APM of type outlet involved dismantling cement masonry & RCC slab with ‘H’ upto 0.5 mtr
Adjusting new APM block in correct ‘y’ and fixing in position
C.C. 1:4:8 with brick ballast 40 mm gauge
Brick masonry in 1:4 CSM
RCC M20 for slab
Bending binding and placing in position CTD bars Fe 500
Extra labour for dressing of bricks for outlet with ‘H’
TITHARTH CONSTRUCTION PRIVATE LIMITED
M/S SANJEEV KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .