Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance JADERUAN KHEPUR SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | -1.55% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹666.25 (0.30%)Admitted-Finance | -1.25% | ₹2.2 L+₹666.25 (0.30%) | L2 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹20,000
Closing Date
9 Feb 2026, 11:00 amClosed
Executive Engineer Minor Irrigation Division Mzp
Executive Engineer Minor Irrigation Division Tedawa Amoi Tanda Fall Road Mirzapur
Construction of RTRWH Prathmik Vidhyalay Duhi Kala
2026_UPMID_1110588_4
1688/M.I./JET/E-Tender/2025-26 Date 22-01-2026
Open Tender
Civil Works
Percentage
20 days
Vill-Duhikala Jamalpur Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,177
Executive Engineer Minor Irrigation Division
₹20,000
Yes
11 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
RTRWH
Excavation of foundation in ordinary soil/sandy loam, clay or sand incluiding lift upto 1.50m and lead upto 30.00m. (Ch-V,S.No. 1(a).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work up to plinth level 1:4:8 (1cement :4 coarse sand (zone-III) :8 graded stone aggregate 20 mm nominal size .Ch-VII.S.No.1(b)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work up to plinth level 1:2:4 (1cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size .Ch-VII.S.No.1(b)+2
1St Class Brick work in foundation and plinth in cement mortar 1: 4 (1 cement : 4 fine sand)including supply of all material, labour and tool and plants etc.Ch-VIII,S.No.3a+4(b)
1st Class Brick work with in superstructure above plinth level up to floor V level in all shapes and size in cement mortar 1: 4 (1 cement : 4 coarse sand).Ch-VIII,S.No.3a+4(b)+6
12 mm cement plaster with cement mortar in 1:4 (1cement : 4 fine sand mortar).Ch-X, S.No.1
Provinding and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering ,finishing and reinforcement- all work up to plinth level 1:1.50:3(1 cement: 1.50 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).Ch-IX,S.No.2b+3
Bending, Binding, Cutting and Placing of reinforcement incluiding cost of biding wire but excluding cost of steel. Ch-IX,S.No.6
Centering & Shuttering of for R.C.C. work including of Rent of shuttering material, labour and T&P required for proper completion of work. Ch-IX, S.No.5a
Supply and filling of 40 mm Stone ballast in filter chamber at site
Supply and filling of P-Gravel in filter chamber at site
Layiang
Supply and filling of coarse sand in filter chamber at site
one layer Dry flat brick floor in filter pit above coarse sand .Ch-XI,S.No.29
Supply of Iron Frame
Labour charge for plumbing work
Supply & Fixing of 110 mm Dia PVc Pipe 6 Kgf/Cm2
Supply and fixing of 110 mm dia pvc Elbow at site
Supply and fixing of 110 dia pvc socket at site
Supply and fixing of 110 mm dia pvc Ball valve at site
PVC cement solvent cement 100 ml
stainless steel jali 100 x 100 mm
Microne Nylone filter
Stailness Steel Screen Jali 0.90×0.30
Over Fhlo Water
S/F Signboard & Photograpy
Writing & Painting Work
Boring with all complete work
GST Excluding
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2051067.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .