Loading…
Loading…
Tender Value
₹34.5 L
EMD Value
₹3.5 L
Closing Date
24 Jul 2026, 6:00 pm
Executive Officer
NPP MAU
WARD NO 01 GALIB PUR KE MUHALLA NASO PUR ME PRATHMIK VIDHYALAYA SE ANIL SINGH KE MAKAN HOTE HUWE RAKESH TIWARI KE MAKAN TAK CC ROAD WA ANSHIK NALI KA NIRMAN KARYA
2026_DOLBU_1163716_1
76-15
Open Tender
Civil Works
180 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,080
Executive Officer
₹3.5 L
25 Jun 2026
25 Jun 2026
25 Jul 2026
25 Jun 2026
24 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials
and including grass cutting /Dressing and
carrage of matrials by Head load | 1 | JOB | 5,000 | ₹5,000 |
| 2 | E/W in excavation in foundation with hard mixed soil etc all complete.
S.I. No 251 | 94.95 | CUM | 115 | ₹10,919.25 |
| 3 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 24 | CUM | 3,250 | ₹78,000 |
| 4 | M-150 B/W in 1:4 in cement and coar
sand mortar including labour and
matrials, T/P with all com. Work SI
No.305 | 72.39 | CUM | 4,980 | ₹3,60,502.2 |
| 5 | 12mm thick Plaster work in 1:3 in cement
and fine sand mortar including labour and
matrials, T/P with all com. Work SI No.583 | 115.5 | SQM | 189 | ₹21,829.5 |
| 6 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 | 14.4 | CUM | 9,430 | ₹1,35,792 |
| 7 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI No.504 | 11.3 | QNTL | 5,650 | ₹63,845 |
| 8 | Construction of Granular sub base (GSB) by
providing coarse graded material spreading
in uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to achieve
the desired density, complete as per Clause
401 .. | 179.55 | CUM | 3,492.6 | ₹6,27,096.33 |
| 9 | Laying CC Road slab Consisting of 1:2:4 in cement, coarse sand and 20 mm Gaugestone grit over preaperd subgrade including labour and matrials
T/P with ass complete WORK SI NO 279(B) | 189.56 | CUM | 8,050 | ₹15,25,958 |
| 10 | P.C.C. Work in 1:2:4 in cement, Coarse
sand and 20 mm GaugeStone grit
including labour and matrials , T/P with
all com. Work SI No. 279(B) | 3.88 | CUM | 6,990 | ₹27,121.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_2181699.xls
BOQ • 0.24 MB
tech76.pdf
Tender Documents • 2.07 MB
Download all tender documents and submit your bid