Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 CrAccepted-AOC SCF 55 SECTOR 7 URBAN ESTATE KURUKSHETRA 136118 | KURUKSHETRA | KURUKSHETRA | HARYANA | 136118 | ₹4.3 Cr | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹4.4 Cr+₹5.5 L (1.27%)Rejected-Finance 2ND FLOOR SHREE RAM GROUP PIPALI ROAD KURUKSHETRA HARYANA PIN 136118 | KURUKSHETRA | KURUKSHETRA | HARYANA | 136118 | ₹4.4 Cr+₹5.5 L (1.27%) | 2 | Rejected-Finance Reject |
| 3 | 3₹4.9 Cr+₹54.4 L (12.6%)Rejected-Finance | ₹4.9 Cr+₹54.4 L (12.6%) | 3 | Rejected-Finance Reject |
| 4 | 4₹4.9 Cr+₹57.5 L (13.3%)Rejected-Finance HOUSE NO 535 SECTOR 18 HUDA KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | ₹4.9 Cr+₹57.5 L (13.3%) | 4 | Rejected-Finance Reject |
| 5 | 5₹5.0 Cr+₹68.2 L (15.7%)Rejected-Finance DLG 13 14 PUSHPA COMPLEX HISAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹5.0 Cr+₹68.2 L (15.7%) | 5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | PARMIL KUMAR L8 | ravi singla engineers and contractors L1 | Raghbir Singh Contractor L8 | Rajiv Tihal Contractor Baliyali L5 | M/S BHANDARI CONSTRUCTION L9 | M/s Swami Ji Construction Co. L4 | The Tibba Dana Sher Co Op L and C Society Limited L6 | VIKASH PROBUILD PRIVATE LIMITED L7 | M/s. Amrit Lal Nagpal L3 | M/S SHREE RAM CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Credit of steel scrap | 1,357.75 | Kg. | 30 ₹-40,732.47 | 30 ₹-40,732.47 | 45 ₹-61,098.71 | 40 ₹-54,309.96 | 28 ₹-38,016.97 Lowest | 44 ₹-59,740.96 | 40 ₹-54,309.96 | 30 ₹-40,732.47 | 30 ₹-40,732.47 | 30 ₹-40,732.47 |
| 2.00 | Supply of APM Blocks | 15 | NO. | 5,000 ₹75,000 | 5,000 ₹75,000 | 5,000 ₹75,000 | 5,000 ₹75,000 | 60 ₹900 Lowest | 1,500 ₹22,500 | 5,000 ₹75,000 | 5,000 ₹75,000 | 5,000 ₹75,000 | 5,000 ₹75,000 |
| 3.00 | Supply of polythene 150 microne. | 513.19 | Kg. | 150 ₹76,978.35 | 150 ₹76,978.35 | 204 ₹1,04,690.56 | 100 ₹51,318.9 | 150 ₹76,978.35 | 70 ₹35,923.23 Lowest | 150 ₹76,978.35 | 150 ₹76,978.35 | 150 ₹76,978.35 | 150 ₹76,978.35 |
| 4.00 | Laying of polythene 150 microne. | 3,631.91 | Sqm | 0.13 ₹472.15 | 0.13 ₹472.15 | 0.15 ₹544.79 | 0.1 ₹363.19 Lowest | 75 ₹2,72,393.47 | 0.22 ₹799.02 | 0.15 ₹544.79 | 0.13 ₹472.15 | 0.13 ₹472.15 | 0.13 ₹472.15 |
| 5.00 | Credit of Np3 pipe | 79.98 | Metre | 3,000 ₹-2,39,931 | 3,095 ₹-2,47,528.82 | 3,000 ₹-2,39,931 | 4,000 ₹-3,19,908 | 75 ₹-5,998.27 Lowest | 4,500 ₹-3,59,896.5 | 5,000 ₹-3,99,885 | 3,095 ₹-2,47,528.82 | 3,095 ₹-2,47,528.82 | 3,095 ₹-2,47,528.82 |
| 6.00 | Credit of Old Useful bricks/brick bats received after dismantling | 4,390.1 | cum | 880 ₹-38,63,292.4 | 880 ₹-38,63,292.4 | 1,080 ₹-47,41,313.4 | 1,000 ₹-43,90,105 | 2.5 ₹-10,975.26 Lowest | 1,111 ₹-48,77,406.66 | 1,200 ₹-52,68,126 | 880 ₹-38,63,292.4 | 880 ₹-38,63,292.4 | 880 ₹-38,63,292.4 |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
21 Jul 2025, 6:00 pmClosed
MUNEESH BABBAR
W.S. Divn. Kurukshetra
To Smooth flow of water (Rough Cost Estimate only)
2025_HRY_453516_1
2025014A2E17 D6EE 4EC7 8323 745C257C40F0145IRR
Open Tender
Civil Works
Works
540 days
JANSUI THOL
2 documents required · 2 mandatory
₹20,000
₹12.8 L
Yes
Kurukshetra
17 Nov 2025
19 Jun 2025
22 Jul 2025
19 Jun 2025
21 Jul 2025
19 Jun 2025
30 Jun 2025
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.26 MB
Tenderdocument.pdf
Tender Documents • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .