Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10.8 L
EMD Value
₹10,800
Closing Date
2 Jul 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Thirumanur
Block Development Office, Thirumanur
Repairs of Panchayat Union Elementary School buildings and School Toilet at Melapalur Panchayat in Thirumanur Block in Ariyalur District under SIDS 2025-2026
2025_RDTN_572820_1
R.C.No.A3/0056/2025
Open Tender
Civil Works - Buildings
Works
90 days
Block Development Office, Thirumanur
As per Tender bid document.
4 documents required · 4 mandatory
₹0
₹10,800
3 Jul 2025
23 Jun 2025
2 Jul 2025
23 Jun 2025
2 Jul 2025
23 Jun 2025
Amount
Repairs of PUE School Two Class Room Building ( West side) in Melapalur at Melapalur Panchayat
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 13,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (50%)
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Towards Drawing Bala painting including aal cost and Conveyance of Material Etc. (the Colour and Quality should be get approved by the Executive Engineer Before Use) the rate include cost of Brushes ,High Scaffolding Charges , Neat Finishing , cost of Brushes etc, Complete Complying with Standard Specification and as Directed by the Departmental officer
Ceiling with solar System Painting including Scaffolding Charges glitter Paints,Brushs etc., including cost and conveyance of all materials and all labour charges etc., complete.
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Provision for Cubboard (Sub Estimate)
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supllying and fixing of Cadapha slb
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supllying and fixing of Cadapha slb
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Name board charges
Repairs of School Toilet at Melapalur PUE School in Melapalur Panchayat
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification.
Supplying and fixing in positon RCC Ring os Size 900mm Dia
Supplying and fixing in positon RCC Cover slab Size 900mm Dia
Supplying and fixing in positon 110mm Dia PVC Pipe
Name Board Charges
Repairs of PUE School Two Class Room Building (North face) in Melapalur at Melapalur Panchayat
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 13,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (50%)
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Towards Drawing Bala painting including aal cost and Conveyance of Material Etc. (the Colour and Quality should be get approved by the Executive Engineer Before Use) the rate include cost of Brushes ,High Scaffolding Charges , Neat Finishing , cost of Brushes etc, Complete
Ceiling with solar System Painting including Scaffolding Charges glitter Paints,Brushs etc., including cost and conveyance of all materials and all labour charges etc., complete.
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Provision for Chappal Rack (Sub Estimate)
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supllying and fixing of Cadapha slb
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Name board charges
Repairs of PUE School Three Class Room Building (East face) in Melapalur at Melapalur Panchayat
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Towards Drawing Bala painting including aal cost and Conveyance of Material Etc. (the Colour and Quality should be get approved by the Executive Engineer Before Use) the rate include cost of Brushes ,High Scaffolding Charges , Neat Finishing , cost of Brushes etc, Complete
Ceiling with solar System Painting including Scaffolding Charges glitter Paints,Brushs etc., including cost and conveyance of all materials and all labour charges etc., complete.
Wiring with 2 x 1.5 sq.mm (22/0.3) PVC insulated SC unsheathed CU. conductor of 1100 v grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150x 100x113 mm TW switch box for 5 A3 pin non inter locking wall socket with 5A flush type switch with painting of suitable colour with continuous earth wire connection of 14SWG TC wire for open PVC plug point (SD 36)
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Supplying and painting two coats old iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Provision for Cubboard (Sub Estimate)
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supllying and fixing of Cadapha slb
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHANDRASEKARAN C (BID ID -1389364)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .