| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.5 LAccepted-AOC BH N 16 KHN 609 NARAYAN NAGAR COLONY INDIRA NAGAR LUCKNOW U P | LUCKNOW | UTTAR PRADESH | 226001 | ₹74.5 L Quoted ₹63.1 L | L1 | Accepted-AOC AoC |
| 2 | L2₹63.9 L+₹83,705.21 (1.33%)Rejected-Finance | ₹63.9 L+₹83,705.21 (1.33%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹64.0 L+₹86,924.64 (1.38%)Rejected-Finance | ₹64.0 L+₹86,924.64 (1.38%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹64.2 L+₹1.1 L (1.73%)Rejected-Finance | ₹64.2 L+₹1.1 L (1.73%) | L4 | Rejected-Finance Rejected |
| 5 | Rejected-Technical 383 ASHUTOSH NAGAR THANA KRISHNA NAGAR DISTRICT LUCKNOW 226001 | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Rejected-Technical Rejected |
Tender Value
₹76.0 L
EMD Value
₹1.5 L
Closing Date
21 May 2026, 12:00 pmClosed
SE RED Lucknow Circle
SE RED Lucknow Circle Near Vikas Bhawan, Sarvoday Nagar, Lucknow
Under District Lucknow, Construction of Road and drain from Amma ji house in Amber Vihar under Faizullaganj second ward to Faizullaganj road from Amma ji house in front of Ramkumar Mishra ji house to Awadhesh Gupta near Jugul Vihar, Lot No 46
2026_REDUP_1144218_46
19/SE RED Lucknow/Lucknow/26-27 Dt 02/04/2026
Open Tender
Civil Works
Percentage
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹1.5 L
SE RED Lucknow Circle
5 Aug 2026
1 May 2026
22 May 2026
1 May 2026
21 May 2026
1 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by Engineer-in-charge 0.30m & above. (PWD SOR 2.6.1.) | 118.94 | Cum. | 152.95 | ₹18,191.87 |
| - | Dismantling of existing structures like culverts, bridges. relaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification. Cement Concrete MORD 202(2.5)(A) | 652.29 | Cum. | 461.7 | ₹3,01,162.29 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 1:4:8 (1 cement 4: coarse sand 8 graded stone aggregate 40 mm nominal size) (PWD SOR 4.1.8) | 39.65 | Cum. | 5,794.05 | ₹2,29,734.08 |
| - | Brick work with common burnt clay (non modular) bricks of class 150 in foundation and plinth in: cement mortar 1:4 (1 Cement: 4 coarse sand) (PWD SOR 6.1.1) | 137.36 | Cum. | 6,379.25 | ₹8,76,253.78 |
| - | Providing and Laying in position Cement concrete of specified grade excluding cost of centering and shuttering - All work up to Plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per S.O.R. 2020 (4.1.2) | 21.67 | Cum. | 6,640.5 | ₹1,43,899.64 |
| - | 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 (1 cement : 4 Fine Sand) SOR 13.7.2 | 645.4 | Sqm. | 187.15 | ₹1,20,786.61 |
| - | Granular Sub-Base with close Graded Material By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Front end loader/ rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 400.1 | 220.88 | Cum. | 3,088.45 | ₹6,82,176.84 |
| - | Water Bound Macadam Grade-3 Providing , laying , spreding and compacting graded stone aggregate of specific sizes to water bound macadam specification including Spreading in uniform layers , hand packing,rolling with three wheel steel/vibratory roller in stages to proper grade and camber,applying and brooming requisite type of screening/ binding material to fill up the interstices of course aggregate , watering and compacting to the required density. as per clause 405 | 165.66 | Cum. | 4,372.85 | ₹7,24,406.33 |
| - | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 331.32 | Cum. | 7,999 | ₹26,50,228.68 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.87 MB
Tendernotice_2.pdf
PDF • 7.54 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_2137749.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .