Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance VESSU ANANTNAG KASHMIR 192102 | 192102 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹34 L
EMD Value
₹68,000
Closing Date
30 Jun 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Macadamization of Boh Dragdan road by way of Providing/ Laying 100 mm thick Wet Mix in stetches, P/L of 50 mm thick bituminous Macadam, 25mm thick semidense with 6mm thick seal coat mechanically with incld. P/L of Khak Bajree and RCC pipes (Agg. L
2020_PWDJK_98786_3
23/2020-21/RNB/Kul/1164-84 Dated 20-06-2020
Open Tender
Civil Works
Item Rate
5 days
Kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Convener, purchase committee, Directorate of ISM
₹68,000
1 Jul 2020
24 Jun 2020
1 Jul 2020
24 Jun 2020
30 Jun 2020
24 Jun 2020
120 days
Amount
Providing and applying of tack coat using hot straight run bitumen of grade 80/100 including heating the bitumen, spraying the bitumen with mechnical operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications clause 503 of MOST on WBM Surface @0.75 Kg/Sqm including all carriages etc complete job.
P/L of Bitumenous macadam base course with stone agg. of quality size and grading as specified in C.P.W. D specifications and straight run bitumen of grade 80/100 @ 3.30% by weight of total mix including hot mixing of stone agg. and bitumen in hot mix plant transporting, mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specification (50mm compacted thickness) complete including cost and carriage of all materials. incld: Extra carriage beyond 15 Kms upto 25 Kms
P/L of 25mm thick Semidence asphaltic base course using mineral aggregate satisfying the gradation set out in specifications, with 5 percent binding content (by weight of total mix) bitumen of grade 80/100 @ 2.88 Kg/Sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specifications (with bitumen 80/100 (quarry)including cost and carriage of all materials. incld: Extra carriage beyond 15 Kms upto 25 Kms
Providing and laying seal coat of premixed fine agg. (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs, of bitumen of grade 80/100 bitumen per Cum of fine agg. and 0.60 Cum of fine agg. Per 100 Sqm of road surface to achieve the desired compaction as per MOST specifications including rolling and finishing with road all complete
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 Kms from cutting edge, disposed earth is to be levelled and neatly dressed in all kins of soil
Supplying and filing of Khah Bajree incld: levelling, spreading, dressing , watering and consolidation with Road Compactor etc incld: cost and carriage of all materails (For Berm)
Providing / laying of RCC pipes in proper position/ grade incld: earth work cutting and providing required quantity of RBM over pipes as cushion incld: cost and carraige of RBM and Pipes 24" Dia RCC Pipes
Removing of damaged RCC Pipes , removing of blockage and refitting of same of spcified dia incld: all leads and lfts incld: eratrh work and P/L of RBM as cushion over pipes complete 18" Dia
FETCH CONSTRUCTIONS
M/S SIR ROAD CONSTRUCTION
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .