Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.8 L
EMD Value
₹98,148
Closing Date
16 Oct 2026, 3:00 pmClosed
Chief Engineer
Motijheel Nagar Nigam Kanpur.
Road improvement work by patch from Amit Medical Store to Pratishtha Guest House via Dr. Bhasin Wali Gali in M Block under Zone 06 Ward 25 Naveen Nagar Kakadev.
2026_NNKAN_1192698_2
597/AA-6/26-27
Open Tender
Civil Works
Fixed-rate
Ward 25
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,148
17 Oct 2026
13 Oct 2026
16 Oct 2026
13 Oct 2026
16 Oct 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | construction of granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp.-Rate-3676.00 per 1 Cum. | 6.56 | cum | 3,676 | ₹24,114.56 |
| 2 | Providing and laying tack coat with using bitmen pressure distributor @0.30 kg/m2 on granular surface cleaned with mechanical broom etc all complete. Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30Kg/sqm on prepared bituminous surface/granular treated with primer & cleaned with hydraulic broom as per Technical specification MORT&H clause 503.-Rate-30.00 per 1 Sqm. | 1,185 | sqm | 30 | ₹35,550 |
| 3 | Table Top Speed Breker-- P/L dense graded bituminious macadam (DGBM) ith 60-90 TPH batch type HMP producing an average output of 75 tones per . P/L dense graded bituminious macadam (DGBM) ith 60-90 TPH batch type HMP producing an average output of 75 tones per .-Rate-14885.00 per 1 Cum. | 13.5 | cum | 14,885 | ₹2,00,947.5 |
| 4 | Table Top Speed Breker-- Prov./ laying bitumious concrete (BC) with computrised HMP type hot mix plant producing an averge output of 75 tonnes per hour crushed aggregates of specifited Prov./ laying bitumious concrete (BC) with computrised HMP type hot mix plant producing an averge output of 75 tonnes per hour crushed aggregates of specifited-Rate-16272.00 per 1 Cum. | 35.1 | cum | 16,272 | ₹5,71,147.2 |
| 5 | Add GST | 1 | Gst | 1,49,716.67 | ₹1,49,716.67 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_2258873.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .