Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.7 LAccepted-AOC SECTOR 47 239 2ND FLOOR TOWER B SPAZEDGE SOHNA ROAD GURGAON HARYANA | GURGAON | GURGAON | HARYANA | 1 | Accepted-AOC 1 | |
| 2 | 2₹19.8 L+₹13,697.81 (0.70%)Rejected-AOC STATE BANK OF INDIA 774 MEHRAULI GURUGRAM PATEL NAGAR 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 2 | Rejected-AOC 2 | |
| 3 | 3₹19.9 L+₹18,630.09 (0.95%)Rejected-AOC SHOP NO 229 GROUND FLOOR SEC 5 REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | 3 | Rejected-AOC 3 | |
| 4 | 4₹20.7 L+₹96,344.79 (4.89%)Rejected-AOC 32 8 DEVILAL NAGAR 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 4 | Rejected-AOC 4 |
| Sl No | Description | Qty | Unit | IR ENGINEERING SOLUTIONS PRIVATE LIMITED L1 | The Nex Lakhan Majra Co Operative Labour and Construction Society Ltd. L2 | WESO PROJECTS L3 | DEEPAK KUMAR YADAV L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Analysis of rate for making house connection of water line damaged during execution | 20 | each | 3,500 ₹70,000 | 500 ₹10,000 | 700 ₹14,000 | 300 ₹6,000 Lowest |
| 2.00 | Making water connection with existing main line complete in all respect | 1 | each | 10,000 ₹10,000 | 5,000 ₹5,000 Lowest | 6,000 ₹6,000 | 5,000 ₹5,000 Lowest |
| 3.00 | Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour | 1 | each | 25,000 ₹25,000 | 5,000 ₹5,000 Lowest | 56,300 ₹56,300 | 58,000 ₹58,000 |
Tender Value
₹23.2 L
EMD Value
₹46,500
Closing Date
15 May 2026, 12:00 pmClosed
Pradeep Kumar
Municipal Corporation Gurugram
Providing and Water supply and Sewerage line and Construction of Colorful unipaver paver tiles(Minimum 3 Colors) Satish Nagar wail Gail in Nangli Umarpur Ward no 15 Div-1B under MCG.Re-call
2026_HRY_520154_1
2026B235B0EF D9E5 400C B590 724481CE618E285ULB
Open Tender
Civil Works
Works
150 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹46,500
Yes
5 Jun 2026
7 May 2026
15 May 2026
7 May 2026
15 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Analysis of rate for making house connection of water line damaged during execution | 20 | each | - | - |
| 2 | Making water connection with existing main line complete in all respect | 1 | each | - | - |
| 3 | Making sewer connection from proposed 300,400,500mm to 600mm existing sewer line complete in all respect including material, T and P , Plugging and Diversion of sewerline and labour | 1 | each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_599043.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .