Tender Value
₹38.3 L
EMD Value
₹76,660
Closing Date
15 Jul 2026, 12:00 pm7d left
EO NP Manikpur
NP Manikpur Sarhat
Construction of Wet WasteProcessing Unite for 5 Tons Nagar Panchayat Manikpur District Chitrakoot
2026_DOLBU_1164858_1
414/NPM/VIGYAPTI/2026-27
Open Tender
Civil Works
90 days
NP Manikpur Sarhat
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,050
EO NP Manikpur
₹76,660
30 Jun 2026
30 Jun 2026
15 Jul 2026
30 Jun 2026
15 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of ground Including removing vegetation and ln-equalilles not exceeding 15 cm deep and disposal of rubbish, lead up 10 50 m and lilt upto1.5 m. All kinds of soil. | 700.07 | Sqm | 12 | ₹8,400.84 |
| - | Earth work In surlace excavation not exceeding 30 cm In depth but exceeding 1.5m In width as well as 10 sqm on plan Including getting out and disposal of excavalad earth upto 50 m and 11ft upto 1.5 m, as directed by Engineer-In-Charge 2.1.1, All kinds of soil. | 120.45 | Cum | 162.5 | ₹19,573.13 |
| - | Excavating, supplying and filling of local earth (Including royalty) by mechanical transport upto a load of SKM also Including ramming and watering of the earth In layers not exceeding 20cm In trenches, pllnth, sides of foundation etc. comnlete | 290.23 | Cum | 235 | ₹68,204.05 |
| - | Providing & Laying of C.C. in 1:4:8 with els and 40 mm G.S.B. In foundallon of Floor I/e all labour materials and T& P etc. | 71.35 | Cum | 4,242 | ₹3,02,666.7 |
| - | R.C.C. Road works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Foundation excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I.Icludind 25 Mycron Polythin & shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | 47.22 | Cum | 7,400 | ₹3,49,428 |
| - | M 150 Class B W in 1:3 cement sand mortar in super structure above plinth i/c of all cost.SI No6.1a | 78.23 | Cum | 7,320 | ₹5,72,643.6 |
| - | Plaster 12mm thick in 1:3 in cement fine sand mortar including supply of material labor etc SI No13.4 | 1,089.95 | Sqm | 135 | ₹1,47,143.25 |
| - | Mild steel or iron work in heavy size such as trusses, build up gates record racks, roof work, gates etc wrought to required from including drilling holes riveting or welding where necessary and their fixing required for proper completion of the work. | 50.04 | Qtl | 7,200 | ₹3,60,288 |
| - | Providing & laying steelbars including cutting binding, placing and complete in all respect | 5.88 | Qtl | 7,200 | ₹42,336 |
| - | Mild steel or iron work in heavy size such as trusses, build up gates record racks, roof work, gates etc wrought to required from including drilling holes riveting or welding where necessary and their fixing required for proper completion of the work. | 65 | Qtl | 7,200 | ₹4,68,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2184423.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid