| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹4.4 L+₹36,768 (9.20%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | 3₹4.4 L+₹44,350 (11.1%)Rejected-AOC | 3 | Rejected-AOC L-3 | |
| 4 | 4₹4.7 L+₹69,020 (17.3%)Rejected-AOC | 4 | Rejected-AOC L-4 | |
| 5 | 5₹4.7 L+₹74,960 (18.8%)Rejected-AOC B 383 KANCHIRAM NAGAR MORADABAD | 5 | Rejected-AOC L-5 |
Tender Value
₹4.4 L
EMD Value
₹4,500
Closing Date
22 Sept 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2020_UPTCL_506478_1
ETC-II/L/41/2020-21
Open Tender
Electrical Works
Item Rate
90 days
220 KV S/S SAROJININAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹4,500
19 Jul 2021
29 Aug 2020
23 Sept 2020
29 Aug 2020
22 Sept 2020
29 Aug 2020
120 days
Amount
Following detailed work is to be done at 220 kV Sub-station Sarojininagar, Lucknow for replacement of 63 MVA 132/33 kV (TAL make) Transformer by 100 MVA 132/33 kV (TAL make) Transformer with all cost of men, misc. consumables, T&P, Crane, Centrifuging Machine with Operator.
Complete dismantling with all the accessories of TAL make 63 MVA 132/33 KV transformer including opening of jumpers, removal of earthing and opening of cable connections. Draining out the transformer oil up to required level in 209 liters capacity oil drums, removal of conservator tank, pipe lines, bushings, cooling fans, marshalling box, radiator after draining radiator oil etc and fixing of blanking plates on the radiators, pile lines, conservator tank, turret etc. with proper stacking as directed by Engineer Incharge.
(a) Shifting of dismantled TAL make 63 MVA 132/33 KV T/F from plinth upto 20 meters distance including turning of tank, if required including all T&P and complete the job satisfactory.
(b) Additional shifting 30 meters, 5 meter per job
(a) Shifting of main tank of TAL make 100 MVA 132/33 kV T/F to plinth from place of storage upto 20 meter distance including turning of the tank if required.
(b) Additional shifting 30 meters, 5 meter per job
Complete erection of TAL make 100 MVA Transformer including radiators, conservator tank, bushing connections, pipe lines, (after through cleaning/flushing using hot oil), cooling fans, motor drive mechanism of tap changer, marshalling box and jumpering of HV and LV side etc. including fabrication of new jumpers if required.
Carriage of 20 KL oil tank from store to working place and from working place to store after completion.
Shifting of T/F oil drums (209 Liters) from the store place to working place and filling the transformer oil in 20 KL oil tank from 209 liters drums and centrifuging upto required BDV valve.
Centrifuging of complete T/F oil in T/F by connection centrifusing pipes, circulating the T/F oil through centrifuging machine and taking the BDV value of the oil periodically till the required value is achived as per direction of supervising engineer. The work includes all the work related to centrifuging the oil and filling the oil in T/F tank from 20 KL oil tank. (12 KLPH Centrifuging machine and operator alongwith lubricants shall be arranged by the contractor at his own cost.)
Earthing of main tank, marshalling box, drive mechanism, transformer neutral etc. of 100 MVA transformer with the help of 50x6mm/75x10mm size MS Flat its jointing with already laid earth mat/deltas at two places and necessary modification in existing support for earthing of neutral bushing, support for its earthing work and then painting of earthing strips as per technical specification.
Jumpering of HV and LV bushing of 100 MVA transformer through 132 KV LA with the help of existing/newly prepared ACSR Panther/ ACSR Twin Moose conductors respectively with associated terminal conductors and PG clamps etc. to connect with 132 KV and 33 KV Bus Bar/CTs.
Dismantling and shifting of 63 MVA transformer’s RTCC panel from control room including necessary disconnection of control cable and shifting the same at proper place as per direction of site engineer.
Erection of TAL make 100 MVA transformer’s RTCC panel including shifting from storage place to relay room as per direction of site engineer. Including cabling and termination of cables with proper cable glands and ferrules.
Laying, dressing and binding of cable including fixing of cable tray support structure and termination of cable marking the top and its ferruling as per schedule and interconnection including shifting of old cable as per requirement of RTCC panel, marshalling box, drive mechanism etc.
Proper packing of LV/HV and neutral bushing of dismantled old 63 MVA transformer including wrapping with polythene sheet in wooden crates of new bushing of 100 MVA transformer.
ROSHNI ENTERPRISES
TAJ ENTERPRISES
Omurmila Constructions
r s enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .