Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance | L1 | Accepted-Finance FIRST LOWEST | |
| 2 | L2₹9.6 L+₹13,415 (1.42%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.6 L
EMD Value
₹10,000
Closing Date
12 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Aman Saheed Hamirpur
Electrification of Line Under EDD Hamirpur
2022_DVVNL_724459_1
49/SE/EDCH/2022-23
Open Tender
Electrical Works
Item Wise
Hamirpur
PQC
2 documents required · 2 mandatory
₹1,180
SE EDC
₹10,000
Yes
18 Jan 2023
30 Aug 2022
12 Sept 2022
30 Aug 2022
12 Sept 2022
30 Aug 2022
30 Aug 2022 - 12 Sept 2022
180 days
Amount
Cartage of Poles from Store center Hamirpur from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labor, T & P carrier etc. required for proper completion of work.
11 M STP Poles
8.5 M PCC Pole
Cartage of line material viz. Weasel conductor, Gi earth wire, cross arm, angle, channel, insulator, clamps and other line material from Store center any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labor, T & P and carrier etc. required for proper completion of work.
Erection of single support Poles including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
11 M STP Poles
8.5 M PCC Pole
Erection of Double pole on Poles including the work of complete H.T. fittings as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
8.5 M PCC Pole
Grouting of pole as per RESSPO manual and as per direction of Engineer incharge including the cost of labor, T&P and carrier etc. required for proper completion of work.
Dismantling and Removal of Existing Weasel conductot from various area stacking and placement their coil and their in the respective J.E.(Store) as per direction of Supervising Engineer.It including the work of cartage the cost of labour, T&P, Carrier etc required for proper completion of work.
Tree Chooping of 11 Kv Line Near By 11 Kv H.T. Line & L.T. Line any other place
Laying, sagging, stringing, binding and jumpring etc. of ACSR Weasel Conductor new/old on the newly erected pole as per RESSPO manual and as per direction of supervising engineer.
Dismantling and Removal of Existing ABC Cable 3X50+1X35+1X16 mm from Various area stcking and placement their coil and their in the respective J..'s (Store) as per direction of Supervising Engineer. It includin the work of Cartage the cost of labour, T&P, Carrier etc required for proper completion of Work.
Dismantling of Broken/Damaged Following Poles of Any other Place
11 M ST Poles
8.5 M PCC Poles
Laying, Sagging, Stringing, Binding an jump ring etc ABC Cable 3X50+1X35+1X16 mm New/Old on the newly erected pole any other place as per RESSPO Manual and as per direction of Superivsing Engeineer.
Re-Sagging of Loose Conductor as per Direction of Supervising Engineer. It includes the cost of labour T&P Carrier etc required for proper completion of work.
Re-Sagging of Lose ABC Cable as per direction of Supervising Engineer. It includes the cost of labour, T&P Carrier etc required for proper completion of Work.
Re-Tighteninf of Stay Complete with nozelling and binding, including cost of labour, T&P etc require for proper completion of work.
Erection of Stay Set including the work of nizzling etc as per RESSPO Manual.
Starightening of Tilled 8.5 M Long PCC/11 M ST Pole at Various place as per direction of Superising Engineer.
Fixing of T-off with Fitting of All Accessories as per direction of Supervising Engineer. It includes the cost of Labour T&P Carrier etc required for proper completion of Work.
Safely De-Maunting of 25/63 KVA old T/F to installtion opf New Double Poles with cartage & Erection as per direction of Supervising Engineer It Inludes the cost of Labour T&P Carrier etc required for Proper Completion of Work.
Replacement of Damage Following Accessories
(A) 11 Kv Disc Insulator
(B) 11 Kv Pin Insulator
(C) 11 Kv X-Arm
JMC Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .