Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹3.9 L+₹4,182.37 (1.07%)Rejected-Finance 142 HAHIHARPUR KENSHILI USTHI SOUTH 24 PARGANAS WEST BENGAL 743375 | 24 PARAGANAS SOUTH | WEST BENGAL | 743375 | ₹3.9 L+₹4,182.37 (1.07%) | L2 | Rejected-Finance REJECT |
| 3 | L3₹4.0 L+₹6,136.75 (1.57%)Rejected-Finance | ₹4.0 L+₹6,136.75 (1.57%) | L3 | Rejected-Finance REJECT |
Tender Value
₹2.9 L
EMD Value
₹5,818
Closing Date
11 Dec 2025, 6:00 pmClosed
BDO
Jorebunglow Sukhiapokhri Development Block
Fencing at Rajdal busty Play ground Sansad no.III, Under Jorebunglow Sukhia Pokhri Dev Block.
2025_DMD_946926_32
40/BDO_SKP/Plan/ (APAS)2025-26
Open Tender
CIVIL WORKS
Percentage
Jorebunglow Sukhiapokhri Development Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹5,818
Yes
19 Jun 2026
17 Nov 2025
15 Dec 2025
17 Nov 2025
11 Dec 2025
17 Nov 2025
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
(a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
(b) River bazree.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
(ii) River bazree.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
Supplying, fitting , fixing chain link fencing of approved quality with R.C.C. posts, wooden posts or iron posts by means of galvanised 'C' clips to grid of horizontal stands of galvanised high tensile spring stell wire of 12 S.W.G. which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. (The rate is exclusive of the cost of posts.).
(iii) 75 mm. x 75 mm. x 8 g.
Labour Cess
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
40NITApash1111.pdf
Tender Documents • 0.78 MB
BOQ_2266228.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .