| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.4 LAccepted-AOC | ₹81.4 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹82.3 L+₹95,553.56 (1.17%)Rejected-Finance | ₹82.3 L+₹95,553.56 (1.17%) | L2 | Rejected-Finance Due to quoted higher rate in comparison to L1 bidder |
| 3 | L3₹90.5 L+₹9.2 L (11.3%)Rejected-Finance 0 272 273 1 | ₹90.5 L+₹9.2 L (11.3%) | L3 | Rejected-Finance Due to quoted higher rate in comparison to L1 bidder |
| Sl No | Description | Qty | Unit | MS TRISHIRA CONSTRUCTION PRIVATE LIMITED L3 | Shrishti Construction L2 | M/S HAR SIDDHI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in Mar, Kankar mixed soils inluding all lift and lead up 60 m including proper making of section & dressing, disposal, all labour T&P with proper completion of work as per direction of Engineer in Charge . | 637.92 | Cum. | 90 ₹57,412.8 | 100 ₹63,792 | 80 ₹51,033.6 Lowest |
| 2.00 | Earthwork in excavation of hard rock with blasting including cost of drilling explosives and proper stacking , all lift and lead upto 60 m , Labour , T&P with proper dressing, disposal of material required for proper completion of work as per direction of Engineer in Charge . | 288.03 | Cum. | 600 ₹1,72,818 | 400 ₹1,15,212 Lowest | 450 ₹1,29,613.5 |
| 3.00 | Dewatering in foundation for construction of structures with Dewatering pumps (supply/hire), including cost of fuel ,labour & T&P etc. as per direction of Engineer-in-charge. | 5,000 | H.P./Hr. | 35 ₹1,75,000 Lowest | 35 ₹1,75,000 Lowest | 35 ₹1,75,000 Lowest |
| 4.00 | Providing/fixing Centering & shuttering for C.C. work including all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge . | 688.23 | Sqm. | 500 ₹3,44,115 | 200 ₹1,37,646 Lowest | 265 ₹1,82,380.95 |
| 5.00 | Providing/fixing Centering & shuttering for R.C.C. work including all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge . | 567.25 | Sqm. | 500 ₹2,83,625 | 430 ₹2,43,917.5 Lowest | 485 ₹2,75,116.25 |
| 6.00 | Providing and Laying C.C M-15 (1:2:4) grade in foundaton,wing wall etc as per Provisions of IS-456-2000. including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge . | 364.14 | Cum. | 5,000 ₹18,20,700 | 3,700 ₹13,47,318 Lowest | 4,184 ₹15,23,561.76 |
| 7.00 | Providing and Laying R.C.C M-25 (1:1:2) grade in foundaton and super structures including cost of all materials, labour and T&P etc as per Provisions of IS-456-2000. (excluding cost of providing and placing reinforcement steel/ bars and shuttering) for proper completion of work as per direction of Engineer in Charge . | 360.44 | Cum. | 6,200 ₹22,34,728 | 5,640 ₹20,32,881.6 | 5,460 ₹19,68,002.4 Lowest |
| 8.00 | Providing and placing in position Steel Rainforcement HYSD Fe-415 grade and shall be treated In RCC M25 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge. | 20.28 | MT | 74,000 ₹15,00,720 | 73,000 ₹14,80,440 | 70,000 ₹14,19,600 Lowest |
| 9.00 | Providing and Laying C.C M-30 (1:0.75:1.5) grade in Bearing Coat as per Provisions of IS-456-2000 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge . | 7.44 | Cum. | 9,000 ₹66,960 | 7,200 ₹53,568 | 5,500 ₹40,920 Lowest |
| 10.00 | Providing 100mm dia AC pipe for weep holes in concrete / masonary walls as per IRC:40,clause 403.11.6 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge . | 24 | RM | 150 ₹3,600 Lowest | 410 ₹9,840 | 350 ₹8,400 |
Tender Value
₹99.2 L
EMD Value
₹2.0 L
Closing Date
11 Apr 2025, 1:00 pmClosed
Superintending Engineer ICC Jhansi
Office of The Superintending Engineer Irrigation construction circle, civil lines, Jhansi
Construction of Cross Regulator at Ch. 44.730 Km of Datia Carrier Canal at D/S side of Ambabai Dy Head District Jhansi
2025_UPIDC_1005208_5
04/SE/2024-25
Open Tender
Civil Works
Item Rate
240 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,531
₹2.0 L
4 Oct 2025
31 Mar 2025
11 Apr 2025
31 Mar 2025
11 Apr 2025
31 Mar 2025
Amount
Earth work in foundation in Mar, Kankar mixed soils inluding all lift and lead up 60 m including proper making of section & dressing, disposal, all labour T&P with proper completion of work as per direction of Engineer in Charge .
Earthwork in excavation of hard rock with blasting including cost of drilling explosives and proper stacking , all lift and lead upto 60 m , Labour , T&P with proper dressing, disposal of material required for proper completion of work as per direction of Engineer in Charge .
Dewatering in foundation for construction of structures with Dewatering pumps (supply/hire), including cost of fuel ,labour & T&P etc. as per direction of Engineer-in-charge.
Providing/fixing Centering & shuttering for C.C. work including all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Providing/fixing Centering & shuttering for R.C.C. work including all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Providing and Laying C.C M-15 (1:2:4) grade in foundaton,wing wall etc as per Provisions of IS-456-2000. including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Providing and Laying R.C.C M-25 (1:1:2) grade in foundaton and super structures including cost of all materials, labour and T&P etc as per Provisions of IS-456-2000. (excluding cost of providing and placing reinforcement steel/ bars and shuttering) for proper completion of work as per direction of Engineer in Charge .
Providing and placing in position Steel Rainforcement HYSD Fe-415 grade and shall be treated In RCC M25 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge.
Providing and Laying C.C M-30 (1:0.75:1.5) grade in Bearing Coat as per Provisions of IS-456-2000 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Providing 100mm dia AC pipe for weep holes in concrete / masonary walls as per IRC:40,clause 403.11.6 including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Providing and fixing in position Hessian base bitumen felts 2.23 kg/sqm type 3 Grade IS:1322 below bearing of R.C.C. Slabs over abudment and pier etc. complete
Providing and filling position bitumen mix filter of proportion 80 kg of hot bitumen, 1 kg of cement & 0.25 cum of coarse sand in expansion joint in with up to 2.5 cm depth up to 1.50 cm including cost of fuel .
Dismentaling lime or cement concrete and brick/stone masonary in foundations or under floors, haunches or arches or terrace and super structure.
Preparation of sub grade excluding cost of earh works for canal lining
Moorum plaster 50 mm thick i/c cost of all material, labour and T & P etc. for proper completion of work.
One coat of hot coal tar on new surface & one coat of hot coal tar after previously painted surface including supply of all materials, labour and T & P etc. reqqired for proper completion of work .
Providing & Laying of 200 micron thick polithine sheet including supply of all material, labour and T & P etc. reqqired for proper completion of work .
Providing and placing in position C.C. M-15 (1:2:4) in canal lining (bed, slopes and coping) including cost of all materials, labour and T&P etc as per Provisions of IS-456-2000. for proper completion of work as per direction of Engineer in Charge.
Supplying & placing of E.C. Bags filled with earth for making Coffer Dam including cost of all materials, labour and T&P etc. for proper completion of work.
Providing and Fixing 4'' Balli with bracing for making Coffer Dam including cost of all materials, labour and T&P etc. for proper completion of work.
Removal of Coffer Dam including cost of all materials, labour and T&P etc. for proper completion of work.
Providing and fixing sign board including cost of all materials, labour and T&P etc. for proper completion of work as per direction of Engineer in Charge .
Hiring of Diesel jeep / bolero with driver and maintenance including fuel cost of minimum @ 10 km per litre as per direction of Engineer in Charge.
Shrishti Construction (BID ID -5100446)
MS TRISHIRA CONSTRUCTION PRIVATE LIMITED (BID ID -5115065)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .