Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹1.6 LAccepted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹1.6 L | Ist | Accepted-Finance Due to low rate |
| 2 | IInd₹1.8 LRejected-Finance | ₹1.8 L | IInd | Rejected-Finance Due to high rate |
| 3 | IIIrd₹2.3 LRejected-Finance | ₹2.3 L | IIIrd | Rejected-Finance Due to high rate |
| Sl No | Description | Qty | Unit | Technocrat Electrical L3 | TIRUPATI ELECTRICALS L2 | P&H Engineering L1 |
|---|---|---|---|---|---|---|
| 1.00 | Work involved repairing/replacement of Jaws and blade of female & male contact assembly, operation rod clamp and oiling greasing of all moving parts of isolator and also making proper alignment of all three limbs/pole R.Y.B. phase by adjusting its link & clamps for smooth and satisfactory operation including labour and T&P etc. welding/gas cutting and other works required for completion of the work. Work also includes proper cable connections for indication ON/OFF in control room. provision of LED in control as per technical specification for indication of position of isolator. Cable termination are also to be checked by the contractor. Note:- if any material required to maintain the isolator shall be provided by departement free of cost rest all other men, material shall be arranged by the contractor on his own cost. | 9 | JOB | 25,000 ₹2.3 L | 19,950 ₹1.8 L | 17,850 ₹1.6 L |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
9 Mar 2026, 3:30 pmClosed
E. E
ETD-Hapur
Work
2026_UPTCL_1117271_1
T-09
Open Tender
Electrical Works
60 days
ETD-Hapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
E. E.
₹2,000
25 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
Work involved repairing/replacement of Jaws and blade of female & male contact assembly, operation rod clamp and oiling greasing of all moving parts of isolator and also making proper alignment of all three limbs/pole R.Y.B. phase by adjusting its link & clamps for smooth and satisfactory operation including labour and T&P etc. welding/gas cutting and other works required for completion of the work. Work also includes proper cable connections for indication ON/OFF in control room. provision of LED in control as per technical specification for indication of position of isolator. Cable termination are also to be checked by the contractor. Note:- if any material required to maintain the isolator shall be provided by departement free of cost rest all other men, material shall be arranged by the contractor on his own cost.
Note:- All T&P, labour material shall be arranged by the contractor at his own Cost.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
NIT09.pdf
Tender Documents • 0.07 MB
TD09.pdf
Additional Documents • 0.20 MB
BOQ_2075847.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid