Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | Accepted-Technical Technically Complied |
| 2 | Accepted-Technical | Accepted-Technical Technically Complied |
| 3 | Accepted-Technical 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | Accepted-Technical Technically Complied |
| 4 | Rejected-Technical | Rejected-Technical NO RELEVENT EXPERIENCE |
Tender Value
Refer Docs
EMD Value
₹82,552
Closing Date
26 Mar 2026, 1:00 pmClosed
Executive Engineer, IIT Dharwad
Executive Engineer, IIT Dharwad
Annual Maintenance Contract for Operations and Maintenance of 2000 Tr District Cooling HVAC Chiller System along with associated components and 150 HP VRV System connected facilities including complaint management of all facilities
2026_IITDW_902257_1
IITDH/IPS/2025-26/064
Open Tender
Electrical Works
Works
365 days
IIT DHARWAD
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹82,552
10 Apr 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
26 Mar 2026
12 Mar 2026
Fixed charges for Annual Maintenance Contract for 2000 Tr HVAC district cooling chiller units, AHU units, duct network, chilled water lines, return water lines, cooling towers and 150 HP VRV systems including attending all complaints, scheduled maintenance, preventive maintenance, Air balancing and to attend maximum efficiency. Contractor shall ensure that air-conditioned facilities shall be maintained at design temperature as mentioned in the scope of works. However, any replacement of major material/parts will be part of defect liability period of installation contract.
Charges for Softening chemical and other Consumables as per the recommendations of OEM and Standard Operating Procedure, [Average Load of the Month Shall be Considered]
Charges for initial cleaning of Colling tower , Addition of softening chemical till achievement of Wet bulb Temperature and starting of initial operations.
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_948355.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .