| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹6.1 LAccepted-AOC | I | Accepted-AOC L1 | |
| 2 | II₹6.4 LRejected-Finance | II | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | V.SELVAKUMAR L1 | P.SANGAVAI L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 24.7 | M3 | 101.75 ₹2,513.23 Lowest | 108 ₹2,667.6 |
| 2.00 | Providing Granular surface base to the required surface using quarry rubbish including cost of material and cost of labour for stacking,spreading and consolidating layer by layer (Each layer not exceeding 100mm ) including hire charges of Roller etc,complete as per the direction of Departmental officers.as per MORTH Rev V 401 | 148.2 | M3 | 642.6 ₹95,233.32 Lowest | 681 ₹1,00,924.2 |
| 3.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four crushed stone sand and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 24.7 | M3 | 5,119.55 ₹1,26,452.89 Lowest | 5,427 ₹1,34,046.9 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 24.7 | M3 | 6,478.95 ₹1,60,030.07 Lowest | 6,868 ₹1,69,639.6 |
| 5.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 84.2 | M2 | 303.65 ₹25,567.33 Lowest | 322 ₹27,112.4 |
| 6.00 | Supply fabrication and placing of steel reinforcement using FE 415 and TMT rods including cost and conveyance of steel and all labour charges etc complete | 830.65 | Kg | 89 ₹73,927.85 Lowest | 94 ₹78,081.1 |
| 7.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 15.1 | M3 | 8,085.75 ₹1,22,094.83 Lowest | 8,571 ₹1,29,422.1 |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
10 Jun 2025, 3:00 pmClosed
Commissioner Kancheepuram Corporation
Kancheepuram Corporation Annai Indira Gandhi Salai Kancheepuram
Construction of RCC Pipe Culvert at Thaiyar Kulam Road Ward.No.38 in kancheepuram Corporation
2025_MAWS_561371_5
7329/2024/E2
Open Tender
Civil Works
Item Rate
Kancheepuram Corporation
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,500
14 Oct 2026
26 May 2025
10 Jun 2025
26 May 2025
10 Jun 2025
26 May 2025
26 May 2025 - 10 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .