Tender ID
Tender Value
₹5.6 Cr
EMD Value
₹4.3 L
Closing Date
2 Apr 2026, 3:00 pmClosed
Execution of P.way works related with deep screening by BCM, ancillary works of TSR by PQRS Machine (Except TSR), cess repair, trolly refuges, shed, store & other P.way related miscellaneous work in RANCHI-TORI section under the jurisdiction of Sr. DEN (south) Ranchi.
DRMENGGRNC-13-2026~SER
DRMENGGRNC-13-2026
Open
Works - General
12 Months
Ranchi, Jharkhand
₹0
₹4.3 L
2 Apr 2026
10 Mar 2026
19 Mar 2026
A- A-Execution of all Works SER-HQ-IR-USSOR 2021-3-Ver-1 with all
B-Execution of all Works CPWD SOR DSR Vol-I & II(2021) with all
Item- 1 Item Breakup
S No. Item Description of Item Unit Qty Rate Amount
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
Earthwork in filling in embankment, guide
bunds, around buried type abutments, bridge
gaps, trolley refuges, platforms etc. with
contractor's own earth conforming to Soil Quality
C l a s s SQ1/SQ2/SQ3, after preparation of
foundations as applicable, benching in existing
banks wherever required, spreading in layers
with motor grader, bringing the moisture content
to OMC, mechanical compaction to specified
density and dressing of bank to final profile as
per RDSO Specifications: RDSO/2020/GE: IRS-
0004 with latest correction slips. Note: 1)
Foundation preparation, Benching including
additional earthwork on account of this,
wherever required, shall be paid extra under
relevant schedule item for benching. 2) Payment
for Earthwork under this item shall be made
based on the cross section measurements
calculated (i) with original ground profile of
existing bank based on initial ground levels
before doing benching and (ii) final profile of the
bank worked out with final levels as per
prevailing guidelines.
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing approaches,
platforms, catch water drains, diversion of nallah
& finishing to required dimension and slopes to
obtain a neat appearance to standard profile
inclusive of all labour, materials, plant &
machinery, leading all cut spoils either to make
spoil dumps or for filling in embankment with
leads within 2 km on either side of edge of the
cutting(s) including all lifts, ascent, descent,
loading, unloading, bailing & pumping out water,
if required, clearance of site and all other works
incidental thereto for completing the work as per
RDSO Specification No. RDSO/2020/GE: IRS-0004
with latest updated correction slips and to the
satisfaction of the Engineer-in-Charge. Note: (i)
All usable earth arising from cut spoils shall be
led into bank formation and Unusable spoils
shall be dumped / stacked away from toe of
embankment. (ii) All hard rock /and boulders not
fit for filling will be stacked by the contractor
and will be property of the Railways. (iii)Cut
trees shall be property of Railways and to be
deposited in the railway godown unless specified
otherwise in the Conditions of Contract.
2 012011 In all conditions and classifications of soil except cum 1459.00 106.59 155514.81
3 012040 Manufacturing of blanketing material by wet cum 2955.00 776.01 2293109.55
mixing of naturally available suitable soil
including additional blending with naturally
available or manufactured material as required
to achieve specified gradation, in designed
proportion in Pug mill or wet mix plant to have
uniform gradation including all incidental
transportation, laying over finished formation in
uniform layer(s) with motor grader, compaction
with suitable vibratory roller to specified density
and finishing to correct profile, complete as per
RDSO Specification No. RDSO/2020/GE: IRS-0004
with latest correction slips.
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
Providing and laying in position Plain cement
concrete of specified Nominal Mix for
miscellaneous works like side drains, foundation
for OHE masts and other miscellaneous
structures excluding the cost of Cement,
centering and shuttering - All work up to plinth
graded stone aggregate 20 mm nominal size)
graded stone aggregate 20 mm nominal size)
6 022070 Providing and fixing Weep Holes in Abutments, Metre 105.00 246.59 25891.95
Wing walls and Return walls etc., of new bridges
with 110mm dia UPVC pipe Type A ISI marked
with all contractor's men, material,
transportation, all taxes as per specifications
and as directed by Engineer-in-Charge.
Centering and shuttering including strutting,
propping etc. and removal of form for :
7 025031 All types of bridge sub-structures, e.g. pier, Sqm 2163.00 674.52 1458986.76
abutment, wing wall, retaining wall, RCC box
type foundations, Abutment cap, Pier Cap,
Inspection Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to 5m above
8 113010 Cess repair/widening work as per RDSO cum 26180.00 303.63 7949033.40
Specifications and guidelines RDSO/2020/GE:
IRS-0004 or latest in running line with suitable
soil to the designed profile The work shall
include uprooting and disposing of all the
vegetation, benching at every 30 Cm vertical
height, earthwork in benching portion and
compaction using suitable slope vibratory
Rollers/Compactors etc. to achieve prescribed
MDD. Note: 1. Payment of cess repairs shall be
based on the quantities worked out from the
cross sectional calculations only and worked out
from the initial ground levels before doing
benching and final levels as done for new
embankment. The earth work in benching
portion shall not be paid extra as the same has
been included in the rate. 2. The earth work shall
be started only after Completing of the benching
and certified. 3. The benching Work shall be
done for a maximum height of 1.50 m at any
time based on the progress of earthwork
starting from toe of the embankment.
First or Second Through Packing of track of all
sleeper density including giving a general lift, as
desired to eliminate sag after Deep Screening
work, lifting of track, lowering of track and major
realignment of curves and formation
rehabilitation as per procedure prescribed in
latest edition of IRPWM. Note: General lift is
normally 25 mm and isolated lift may be up to
9 131032 For PSC Sleeper Track with Sleeper Density of TRM 22343.00 275.70 6159965.10
Third or subsequent Through Packing of track for
all sleeper density including picking of slacks, as
required after second through packing,
subsequent to Deep Screening work as per
procedure prescribed in latest edition of IRPWM.
This item can also be used after
lifting/regrading/realignment works also. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
10 131042 For PSC Sleeper Track with Sleeper Density of TRM 22343.00 212.08 4738503.44
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
11 154010 Carrying out preparatory works for operation of TRM 89275.00 16.24 1449826.00
Ballast Cleaning Machine (BCM) which includes
making trench in track for inserting cutter bar,
supporting track on wooden block supplied by
Railway, removal of ballast along with muck
from shoulder which is out of reach of cutter
chain and putting the same in cutting width or
between rails. Rate includes all miscellaneous
works, e.g. opening and re-fixing of joggled fish
plates, OHE Bonds, dismantling & removing
obstructions etc.
12 154020 Carrying out various works during operation of TRM 89275.00 39.25 3504043.75
BCM, like filling up of ballast at deficient location
from locations where ballast is excess or from
adjoining tracks, required initial packing,
adjustment of PSC Sleepers, provision wooden
blocks supplied by department and attending
track parameters etc. complete so as to make
track fit for 20 kmph speed.
13 154030 Removal of screened muck discharged by BCM, TRM 89275.00 29.80 2660395.00
where muck disposal on side slope is restricted
due to platform, cutting, OHE mast etc. and
disposing it beyond 5m from edge of cutting up
to 3m deep or alternatively carting it up to 50m
for disposing off beyond the end of cutting /
platform and making up cess wherever low.
( X 4) disposal of muck at a distance beyond 50m for
every additional lead of 50 metres or part
thereof up to 500 metres.
15 154070 Removing the ballast from shoulders, left over TRM 89275.00 20.64 1842636.00
after BCM working, screening the same
removing the muck and putting back the
screened ballast into track, boxing the ballast to
profile and using released muck for cess making
or throwing away within 50m lead and 3m lift
when not required for cess repairs and as
directed by the Engineer-in-charge. Note: This
item shall be used only when BRM is not
16 154080 Ballast equalisation & ballast profiling after TRM 89275.00 37.02 3304960.50
completion of deep screening work by BCM
and/or after unloading of ballast by DMT (Ballast
Train), as directed by Site Engineer as per
IRPWM including heaping of ballast in tamping
zone keeping rails & sleeper top free from
ballast, spacing and squaring of sleeper,
gauging, cleaning of muck, proper fixing of
fastening, attention during each round of sleeper
tamping in relation to pre & post working Note:
Payment shall be made only once in irrespective
of numbers of TTRM packing round and after
restoration of normal speed and restoration of
complete ballast profile and cess profile.
17 154090 Making cess in deep screened track by using TRM 8928.00 33.10 295516.80
screened muck discharged by BCM where cess
is low or cutting cess to required depth up to 4m
from centre of track, where cess is high and
disposing off extra muck beyond 5m from edge
of cutting which are up to 3m deep or
alternatively carting it up to 50m for disposing it
off beyond cutting or platforms, so as to make
cess as per standard profile including providing
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
Carrying out pre-tamping, during tamping and
post-tamping work for tamping track with all
types of rails, sleepers & sleeper density by
various Track Tamping machines, like
CSM,DUO/3X Machines which include : (1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by picking
ballast from stacks / shoulders / crib of adjoining
track up to lead of 50 m to ensure effective
packing; (2) Clearing of ballast on sleepers to
make them visible to operator, (3) Clearing of
ballast over rail foot to facilitate holding of rail
by rollers of TTRM; (4) Digging, screening and
replenishment of ballast at mud pumping /
rounded ballast in sleeper crib location; (5)
Tightening of loose fittings immediately before &
after tamping; (6) Replacement of broken /
missing fittings supplied by Railway; (7)
Correcting displaced sleepers to position along
with squaring; (8) Re-setting of worked-out /
fallen fittings. (9) Removing and re-fixing
joggled fish plates & wooden blocks, wherever
necessary; (10) Manual consolidation of ballast
in crib / shoulders; (11) Removing and refixing of
traction bonds during the block in electrified
sections (12) Dressing of ballast Note: 1.
Tamping blocks are not identical & it may be
given at any time either during day or night. 2.
Stages of payment a) 30% of the rate will be
paid on completion of pre tamping attention, b)
Balance 70% of the rate will be paid on
completion of post tamping. 3. Recovery at the
rate of twice the above applicable rate will be
effected in case contractor fails to carry out
pre/during/post operation. 4.Payment shall be
made only once in irrespective of numbers of
TTRM packing round and after restoration of
normal speed and restoration of complete
ballast profile.
Providing lighting arrangements with halogen
lamps on and around machine during machine
working in night time blocks, with contractor's
generator, consumables, all necessary electrical
fittings, operators etc. Note: 1. Lighting
arrangement is to be provided as per advance
planning of Night Blocks and written
communication. 2. In case lighting arrangement
is made available but not used due to non-
availability of block, payment @ 60% of the item
rate shall be made. 3. In place of Halogen, LED
lamps of equal lumen capacity may be used with
the approval of Engineer -in-Charge. 4. If lighting
arrangement fails during block, recovery shall
be made twice the rate per day.
generator and 8x500 W)
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
21 211130 Providing and fixing Trolley Refuge of size 3.0m Each 42.00 4031.93 169341.06
x3.0m on cess, placing with released
unserviceable PSC sleepers and keeping them at
all four sides of refuge and also placing as
matting inside the refuge by keeping them in
upside down position with a minimum of 14
sleepers including levelling with earth,
excavation, all lead and lift, crossing of tracks,
leading the sleepers with in a free lead and lift,
handling etc., with all contractor's men material
complete and as directed by the Engineer-in-
charge. Note: Earth-work will to be paid
separately under relevant item.
Schedule B-Execution of all Works CPWD SOR DSR Vol-I & II(2021) with all correction slips up to
Item- 1 Item Breakup
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means in
foundation trenches or drains (not exceeding 1.5
m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, lift
upto 1.5 m, including getting out the excavated
soil and disposal of surplus excavated soil as
directed, within a lead of 50 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete
of specified grade excluding the cost of
centering and shuttering - All work up to plinth
derived from natural sources : 3 graded stone
aggregate 20 mm nominal size derived from
natural sources)
Centering and shuttering including strutting,
propping etc. and removal of form work for :
3 4.3.1 Foundations, footings, bases for columns Sqm 204 307.95 62821.8
10.0 STEEL WORK
Steel work in built up tubular (round, square or
rectangular hollow tubes etc.) trusses etc.,
including cutting, hoisting, fixing in position and
applying a priming coat of approved steel
primer, including welding and bolted with special
shaped washers etc. complete.
12.0 ROOFING
Providing and fixing on wall face unplasticised -
PVC moulded fittings/ accessories for
unplasticised Rigid PVC rain water pipes
conforming to IS : 13592 Type A, including
jointing with seal ring conforming to IS : 5382,
leaving 10 mm gap for thermal expansion.
RANCHI DIVISION-ENGG/SOUTH EASTERN RLY
12.50 Providing and fixing precoated galvanised iron Sqm 438 671.55 294138.9
profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-charge)
0.50 mm (+ 0.05 %) total coated thickness with
zinc coating 120 grams per sqm as per IS: 277,
in 240 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester
top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to
avoid scratches during transportation and
should be supplied in single length upto 12
metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling /self
tapping screws of size (5.5x 55 mm) with EPDM
seal, complete upto any pitch in horizontal/
vertical or curved surfaces, excluding the cost of
purlins, rafters and trusses and including cutting
to size and shape wherever required.
Providing and fixing precoated galvanised steel
sheet roofing accessories 0.50 mm (+0.05 %)
total coated thickness, Zinc coating 120 grams
12.51 per sqm as per IS: 277, in 240 mpa steel grade,
5-7 microns epoxy primer on both side of the
sheet and polyester top coat 15-18 microns
using self drilling/ self tapping screws complete :
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete manually/ by
mechanical means including disposal of material
within 50 metres lead as per direction of
Engineer - in - charge.
equivalent design mix)
Demolishing stone rubble masonry manually/ by
mechanical means including stacking of
15.9 serviceable material and disposal of
unserviceable material within 50 metres lead as
per direction of Engineer-in-charge :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .