Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance TYPE III 17 JME COLONY SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | Admitted-Finance |
| 2 | Admitted-Finance NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | Admitted-Finance |
| 3 | Admitted-Finance 245 RAJABPUR RAJABPUR RAJABPUR JYOTIBA PHULE NAGAR UTTAR PRADESH 244236 | AMROHA | UTTAR PRADESH | 244236 | Admitted-Finance |
Tender Value
₹43.0 L
EMD Value
₹50,000
Closing Date
17 May 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SE, OMC-II, BTPS, ANPARA
Routine, Preventive and Break down maintenance of ID/FD/PA Fans, FO Pumps , Flue gas Duct, APH and its associated Parts of unit No 4 and 5 of 2 x 500 MW, BTPS, Anpara
2022_RVUNL_685596_1
01/BMD-II/BTPS/2022-23
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
BMD-II, BTPS, Anpara
As per Tender Specification
2 documents required · 2 mandatory
₹590
DY CAO CFA AND BO BTPS ANPARA
₹50,000
26 May 2022
7 Apr 2022
18 May 2022
7 Apr 2022
17 May 2022
7 Apr 2022
120 days
Amount
Routine Maintenance of ID/FD/PA Fans, Flue Gas Duct, FO Pumps& House Keeping of Fuel oil Pump House
Cleaning, sweeping & House-keeping of fuel oil pump house, Day oil tank area, Recovery oil pump house and its connected pipe lines, gates, Valves, Strainers, Walk way & railing etc.
Complete cleaning of soak pit of toilet
Routine & preventive maintenance of ID/FD/PA Fans, Dampers, Gates and Fuel oil pump house and its connected auxiliary including cleaning/wiping etc. in Unit 4&5,2x500MW, ‘B’TPS, Anpara.
The work of Scrubbing, Collection & Heaping of Fly Ash from APH outlets distribution damper to chimney and disposal of accumulated fly ash by means of tractor trolley in unit 4& 5, 2x500MW, ‘B’TPS, Anpara
Servicing & Cleaning of drain filter and air breathers of fuel oil tank.
L.D.O. transfer from ATPS to BTPS day tank
Complete inside cleaning of Recovery fuel oil tank situated at -4 m level /Drain Oil Pit of Pump House filled by LDO sludge.
Preventive & Break down maintenance of ID/FD/PA Fans & its Auxiliaries ITEM No 01: - Works Of I.D. Fan
Replacement of journal bearing NDE/DE Side of ID Fan
Replacement of Gear coupling of ID/FD/PA Fans (Motor and Fan Rotor)
Servicing & checking of journal bearing NDE/DE side.
Servicing & Repairing of Oil cooler of I.D. Fan
Checking and rectification of oil guard of I.D Fans
Alignment of ID fan with motor/ hydraulic coupling
Rectification of faults of Auxiliary oil pumps of I.D. Fan.
Overhauling of hydraulic coupling of I.D. Fan.
Overhauling of MOP of I.D. Fan.
Centrifuging of oil I.D. Fans
Greasing of Coupling of ID/FD/PA Fans.
Cleaning and Greasing of IGV system of ID/FD/PA Fans.
Erection of temporary scaffolding and providing assistance in complete internal inspection of impeller of both I.D. Fans
ITEM No 02:- Works Of P.A. Fan
Replacement of journal bearing NDE/DE sides of PA Fans
Servicing & checking of journal bearing NDE/DE side.
Checking & servicing of lube oil system of P.A. Fan.
Servicing & Repairing of Oil cooler of P.A. Fan
Removal and rectification of P.A. Fan oil pump coupling including alignment.
Checking and rectification of oil guard of P.A. Fans.
Alignment of P.A. Fan with motor
Erection of temporary scaffolding and providing assistance in complete internal inspection of impeller of both P.A. Fans
Servicing of MOP/ AOP of PA Fan
Repairing/Reconditioning of MOP/AOP Shaft of PA fan
ITEM No 03 :- Works Of F.D. Fan
Replacement of journal bearing NDE/DE sides of FD Fans
Servicing & checking of journal bearing NDE/DE side.
Checking and rectification of oil guard of F.D. Fans.
Alignment of F.D. Fan with motor
Centrifuging of oil P.A./ F.D. Fans
Erection of temporary scaffolding and providing assistance in complete internal inspection of impeller of both FD Fans
Preventive & Break down maintenance of Fuel oil Pumps & its Auxiliaries
Overhauling & Rectification of faults of Fuel Oil Pump.
Overhauling and Rectification of faults of Fuel Oil Drain Oil Pump/Fuel Oil drain Oil Recovery Pump/Fuel Oil Dyke Oil Pump.
Overhauling and Rectification of Fuel Oil suction /discharge and inlet Day Oil Tank strainer.
Preventive & Break down maintenance of Flue gas Duct & its associated Parts
Servicing of PA fan outlet gates/ PA Fan hot air gates/ PA fan cold air gates/ Primary air shut off gates/ID Fan inlet & outlet gates, rectification of defects, if any.
Servicing of inlet/ outlet gates of ESP, rectification of defects, if any.
Manual operation of ESP inlet / outlet gates/Primary air cold shut off gate/ primary air shut off gates/Mill manual hot air gates etc. rectification of defects if any.
Complete cleaning of the duct of
FD fan suction box to FD fan discharge duct
PA fan suction damper to PA Fan outlet gate & hot air duct header
Servicing & repairing of discharge /suction dampers of FD, PA and flue gas / air damper.
Buildup /repair of worn-out shaft of gas distribution damper of primary/secondary APH, A & B side.
Fabrication of flaps of outlet gas of distribution dampers of APH of flue gas path.
Primary damper
Secondary damper
Replacement of eroded/worn out primary/secondary/outlet gas distribution damper flaps by new flap in flue gas path.
Primary
Secondary
Replacement of shafts in NDE & DE sides outlet flue gas distribution dampers of primary/ secondary air heater (NDE & DE) side shaft consists of (one) job.
Repairing / servicing of butterfly valve installed on the cold air line (dia. 300mm) connected to the mills manual hot air gate.
Replacement of eroded frame & cover of existing chutes meant for disposal of ash installed at ESP inlet/ ESP outlet header and ID Fan discharge header.
Welding & Patch work in flue gas duct, secondary air duct/ primary air duct Including dampers flap, bracing pipes, baffle plates and hopper etc.
Running meter Welding
Patch work
Replacement of damaged & eroded bracing pipe with new bracing pipe of Hot air duct/Cold air duct/Flue gas duct
Work of removal of old eroded worn out Diversion Post of Flue gas duct and fabrication, erection and installation of new Diversion Post of Flue gas duct.
Daily Routine and Breakdown maintenance work of Primary & Secondary Air Pre-heater of unit no: - 4&5, 2X500MW, BTPS, Anpara.
Daily routine/Preventive maintenance works, up keeping, attending faults of minor nature of Primary and Secondary Air Pre-heater and their associated equipments unit no 4 & 5, round the clock. One job includes the above work in three shift (one shift is of duration 8.00 hrs.) in a day for one unit of 2X500 MW.
Opening of all the access doors of APH HE &CE for inspection & execution of the work & closing them after completion of work by applying holdite & replacing old asbestos rope with new one.
Primary APH
Secondary APH
Providing temporary scaffolding at HE/CE for inspection & execution of works and removal of the same after completion of work
Primary APH
Secondary APH
Servicing of lube oil system of Guide/Support Bearing of APH. One job includes one lube oil system of Guide/Support bearing of Primary/Secondary APH.
Servicing of Rotor drive unit of APH. One job includes one drive unit of Primary/Secondary APH.
Revisioning / replacement & resetting of HE/CE inboard, interm. & outboard radial seals.
Primary APH
Secondary APH
Revisioning / replacement & resetting of Bypass seals
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Revisioning / replacement & resetting of Axial seals
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Revisioning / replacement & resetting of Rotor Post seals
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Repairing / replacement of seal ring segment
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Repairing / replacement of Static seal plate.
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Servicing Repairing/Replacement of air motor of
Primary APH
Secondary APH
Alignment of rotor drive unit with electric / air motor of
Primary APH
Secondary APH
Servicing / repairing of single nozzle cleaning device & checking of its travel of
Primary APH
Secondary APH
Cleaning of APH heating element in situ cond. with the help of water / air jet of
Primary APH
Secondary APH
Replacement / repairing of eroded / damaged bracing pipes of APH
Repairing of expansion joints/strengthen of old welding of duct from flue gas/air outlet dampers of APH
Revisioning/repairing of air seal housing of
Primary APH
Secondary APH
Repairing of manholes of
Primary APH
Secondary APH
Repairing of eroded casing of APHs
Checking of fire fighting/water washing pipe & replacement/ blanking of eroded nozzles. It also includes the removal of chocking of the pipe & patching over eroded portion
Primary APH-Hot End
Primary APH-Cold End
Secondary APH-Hot End
Secondary APH-Cold End
Replacement of oil seals of the drive shaft of the rotor drive unit of APHs
Primary APH
Secondary APH
Removal of scrap material from ash hopper of
Primary APH
Secondary APH
Servicing/Replacement of Bearing of hoist for APH in situ condition.
Dismantling & Lowering of APH Hoist trolley from its position and after completion of work lift it & assemble it to the same position
Reclamation/Repairing/Conversion of worn out basket of PAPH and SAPH i.e. Hot End & Intermediate.
Fabrication & erection of plate forms /structures for facilitating the various running and breakdown maintenance works of Primary and Secondary Air pre-heaters
Replacement/Repairing / adjustment of adjuster bolt of axial seal plate / Radial sector plate
Primary APH
Secondary APH
Fixing of Sealing bar & Sealing strip over hot end baskets of
Primary APH
Secondary APH
Straightening & repairing of bent diaphragm of
Primary APH
Secondary APH
Replacement/Repairing of eroded 'T' Bar
Primary APH
Secondary APH
Servicing of gate valves and non-return valves of water washing line of primary & secondary Air pre-heater
Removal of choking of Ash Hoppers of
Primary APH
Secondary APH
Removal of Ash accumulated over the space in between the rotor shell and APH outer body shell of
Primary APH
Secondary APH
Alignment of rotor level of
Primary APH
Secondary APH
Rectification of bulged/damaged rotor shell segment and alignment of pin rack
Primary APH
Secondary APH
Servicing/Replacement of gear box, counter weight & related accessories of single nozzle cleaning device of
Primary APH
Secondary APH
Servicing/Replacement of lube oil pump of Guide/Support bearing of
Primary APH
Secondary APH
Replacement /repairing of damaged rotor angle/bypass angle of
Primary APH
Secondary APH
Repairing/reconditioning of soot blowing gear box of Secondary/ Primary APH (Air Pre-Heater) of Unit no.4 & 5, 2x500MW, 'B'TPS, Anpara.
Gorakhpur Construction company pvt ltd
U.S.Enterprises
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .