| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹35,794.59 (13.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.5 L+₹83,455.86 (31.2%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,780
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer, REW, Jammu
Office of the Executive Engineer, REW Jammu
Development of Cremation Ground at Bala Nardi, Panchayat Nardi, Block Maira Mandrian under DDC capex budget for the year 2026-27.
2026_RDPR_324375_7
e-NIT No. 572 REWJ of 2026-27 dated 11-09-2026
Open Tender
Civil Works
Percentage
Executive Engieer, REW Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹7,780
29 Sept 2026
12 Sept 2026
26 Sept 2026
12 Sept 2026
25 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 6.65 | Cum | 479.3 | ₹3,187.35 |
| 2 | Providing and laying in position cement concrete of 1:5:10 grade(1 cement: 5coarse sand : 10 graded crushed stone aggregate 40mm nominal size) excluding the cost of centring and shuttering- All work upto plinth level | 15.2 | Cum | 4,826.5 | ₹73,362.8 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 10.8 | Cum | 5,733.6 | ₹61,922.88 |
| 4 | Supply and placing of stone in plum concrete work | 3.96 | Cum | 937.9 | ₹3,714.08 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 45.9 | Sqm | 286.35 | ₹13,143.47 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 807.25 | kg | 156.95 | ₹1,26,697.89 |
| 7 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer 63mm Thickness | 67.2 | Sqm | 974.05 | ₹65,456.16 |
| 8 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 100.09 | Cum | 276.6 | ₹27,684.89 |
| 9 | Carriage of Sand and Agg average distance 10 Km by M.T | 35.71 | Cum | 279.04 | ₹9,964.52 |
| 10 | Carriage of stone average distance 5.00 Km by M.T | 3.97 | Cum | 236.16 | ₹937.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1094139.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .