RequiredExperience with Government
RequiredAnnual Turnover
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Sanitary Napkins Incinetator Machine With Smoke Control Unit ( 1750 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERAL Type - * Purpose Burn used Sanitary Napkins to sterile ash and stop automatically * Color - * 1/9 Operation Mode Electronically operated
Requiredfully Automatic * Loading Type - * Stand provided Yes Yes
RequiredNo Number of chambers Two * Trap Door available Yes * All MS parts Powder coated Yes * Spare parts should be available for Minimum 5 years from date of supply Yes * All electrical parts are ISI Marked Yes * DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 25 25
Required40 Thickness of MS/SS sheet of housing cabinet (external) (mm) 1.2 * Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 5 3
Required5 Or higher Machine Width(mm) - * Machine Depth (mm) - * Machine Hight(mm) - * Machine Weight(kg) 5-15 5-15
Required16-30
Required31-50
Required51-250 Door width(mm) - * Door height(mm) - * Thickness of door (mm) 40 20
Required25
Required40
Required50
Required60 Internal/burning chamber shape - * Flexible emission Outlet pipe dia (mm) - 25
Required40
Required50
Required63
Required76 Detachable ash tray length (mm) - * Detachable ash tray width (mm) - * Detachable ash tray height (mm) - * Stand Height (mm) - * 2/9 Stand Width (mm) - * Stand Depth (mm) - * MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet
RequiredStainless Steel sheet of SS-304 grade Material of Burning chamber (Internal) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet
RequiredStainless Steel sheet of SS-304 grade Finish of MS parts of cabinet Epoxy anti rust proof painting for superior finish * Material of Thermal Insulation High Density Ceramic Fiber sheet High Density Ceramic Fiber sheet
RequiredHigh Density Ceramic Board CONSTRUCTIONAL FEATURES Thermal insulation of burning chamber housed in outer chamber Yes * Burning Chamber tray provided Yes * Emission Outlet pipe location - * Means of connecting the unit outlet with flue gas emission pipe - * Type of door lock provided Magnetic lock * CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes * Timer provided Yes * Auto cut-off temperature display Yes * Digital display to see actual and set temperature Yes * Minimum Burning temperature (degree C) 800 * Burning Capacity per day (Number of Napkins) 100-200 100-200 Burning Capacity at a time (Number of Napkins) 26-50 1-15
Required16-25
Required26-50 Residue Ash per Napkin (gms) 1 * Burning time of full capacity 10 10.0 3/9 Napkins/pads (minutes) Skin temperature of the unit under operation (deg C) 0-15 * Installation
Requiredtraining
Requireddemonstration and plumbing included Yes * ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes * Automatic digital controller for temperature Yes * Equipment ON/OFF indicator provided Yes * Power supply - * Electrical Power Consumption(Watt) - * Minimum length of power chord to be supplied along with machine (mtr) 2 * Type of Heater Ceramic heater containing coil * Power saver (auto power cut-off) Yes * Safety MCB provided (16A to 30A) Yes * Protection against electric shock when checked as per IS:302-1/2008 Yes * Minimum Insulation Resistance (IR) at 500 VDC (Mega Ohm) 2 * Maximum Electrical Insulation and Leakage current as per IS:302-1/2008
Required(mA) 0.21 * Maximum Earthing continuity test when tested as per IS:302-1/2008 (Ohm) 0.1 * HV test at 1000 V rms for 1 Sec when tested as per IS:302-1/2008 No breakdown shall occur during the test * SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) - * 4/9 Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet Mild Steel(CRCA) cabinet
RequiredStainless Steel of SS-304 grade Finish of MS parts of SCU cabinet - * Overall height of SCU (mm) - * Overall width of SCU (mm) - * Overall depth of SCU (mm) - * Number of chambers for filteration of smoke emission Two * Both carbon Control and Foul odour Control Chambers for filteration of smoke emission Yes * Number of filters in Carbon control chamber Two One
RequiredTwo
RequiredThree Type of filters in Carbon control chamber Activated Carbon filter Teflon filter
RequiredActivated Carbon filter
RequiredSteel mesh filterr
RequiredTeflon filter & Activated Carbon filter
RequiredTeflon filter
RequiredActivated Carbon filter & Steel mesh filter
RequiredCeramic blanket as a filter Number of filters in Odour control chamber One One
RequiredTwo
RequiredThree Type of filters in Odour control chamber Activated Carbon filter * Blower type "Centrifugal
Requireddirect driven" * Blower RPM 2700 1800
Required2700 Power supply of SPU 230v +/-10%
Required50Hz
RequiredSingle phase
RequiredAC supply * Minimum length of flexible emission outlet pipe to be supplied along with machine (mtr) 3 * Cost of additional flexible emission outlet pipe
Requiredif required on Yes * 5/9 actuals to be paid by the user EMISSION STANDARD FOR SMOKE Conformity to CPCB
RequiredMin of Environment & Forests standard HAZWAMS/30/2005-06 Yes * Particulates (Half hourly average) (mg/Nm3) (Max) 50 * HCl (Half hourly average) (mg/Nm3) (Max) 50 * SO2 (Half hourly average) (mg/Nm3) (max) 200 * CO (Half hourly average) (mg/Nm3) (Max) 100 * CO (Daily average) (mg/Nm3) (Max) 50 * Total Organic Carbon (Half hourly average) (mg/Nm3) (Max) 20 * HF (Half hourly average) (mg/Nm3) (Max) 4 * "Nox (NO and NO2 expressed as NO2) (Half hourly average) (mg/Nm3) (Max)" 400 * Total dioxins and furans ( 6 to 8 hours sampling basis
RequiredPlease refer guidelines for 17 concerned congeners for toxic equivalence values to arrive at total toxic equivalence) (ng TEQ/Nm3) (Max) 0.1 * Cd + Th + their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * Hg and its compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.05 * 6/9 Sb+As+Pb+Cr+Co+Cu +Mn+Ni+V+their compounds (Sampling time anywhere between 30 minutes and 8 hours) (mg/Nm3) (Max) 0.5 * Loss on ignition (max) (% dry weight of the material) 5 * PACKING Packing - * MARKING AND INSTRUCTIONS The appliance is marked as per IS:302-1/2008 Yes * CERTIFICATION Submission of Test Report from Central Government NABL/ILAC accredited Lab specifically containing Electrical & Electronic parameters
RequiredThermal insulation material of burning chamber etc in addition to the declared specification parameters at the time of supply Yes * Submission Test Report for equipment for compliance of Flue gas emission and ash upon combustion of Sanitary Napkins/Pads to Central Pollotution Control Board (CPCB) norms from NABL accredited lab at the time of supply Yes * Certification Available EU-CE * Certificate for Manufacturing premises available ISO * Compliance certificate is to be furnished after conducting comprehensive performance test by the supplier Yes * Submission of all the certifications to the buyer along with Yes * 7/9 supplies PERFORMANCE REQUIREMENTS Warranty (Yrs) 1 1 * Bold specifications are the golden parameters.