Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAccepted-Finance | ₹48.0 L | L1 | Accepted-Finance ok |
| 2 | L2₹48.0 L+₹2,619.60 (0.05%)Accepted-Finance | ₹48.0 L+₹2,619.60 (0.05%) | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | KAMLESH ENGINEERING WORKS L1 | V.K. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of old damaged paddles, scrapers, pit scrapers, vertical bridge arm for outside flocculator zone and inside flocculator zone,
bridge arm, flocculator arm etc. as required & dismantling of base of bridge from the base frame to turn table mechanism and lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making the by welding to make strong thrust support by welding process with deploying technical staff / labour, T&P tool and tackles after complete the work as per site requirement. | 1 | JOB | 2,99,800 ₹3,53,764 Lowest | 2,99,950 ₹3,53,941 |
| 2.00 | Lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making strong thrust support by welding process with deploying technical staff / labour, T&P tool & tackles to complete the work as per site requirement. | 1 | JOB | 1,99,900 ₹2,35,882 Lowest | 1,99,980 ₹2,35,976.4 |
| 3.00 | Servicing of centre mechanism are as under : Before opening of the centre mechanism, the whole structure of centre cage of both flocculator arm & scrapper arm. The whole weight of centre cage is totally by making support of central pit by welding of 4 Nos. vertical support with the centre cage so that complete structure is to be fixed on its position like flocculator arm support & clarifier arm support so that complete structure stand proper support while this centre mechanism should be free from these structure so removal of all parts one by one with proper carefully with lifting arrangement is to be providing at centre RCC Pillar support as required by job. | 1 | JOB | 99,950 ₹1,17,941 Lowest | 99,980 ₹1,17,976.4 |
| 4.00 | Making a temporary platform along the turn table to use as a working platform around the drum so that easily movement of working staff should move around the turn table. 25 Days @ 4000/-Per day. | 1 | JOB | 99,950 ₹1,17,941 Lowest | 99,980 ₹1,17,976.4 |
| 5.00 | Making an arrangement for removing of drive system of turn table like top bearing block, bearing block shaft, bevel pinion also from the top of turn table (centre mechanism) & taking out this item with chain block arrangement to outside of drum at bottom of clarifier & put on safer side of clarifier. | 1 | JOB | 74,900 ₹88,382 Lowest | 74,950 ₹88,441 |
| 6.00 | Cutting of all tensile nut bolt of centre cage of flocculator drum. But gas cutter almost 16 nos. tensile bolt & removing of by hammering etc. as required to free hole of both turn table as well as centre cage. & top big worn gear to be lift by overhead two leg lifting arrangement & lifting from the centre mechanism (turn table) parts & lifting with carefully in parallel way to make free from all side and with help of second chain block arrangement to keep big worn part of centre mechanism slowly-slowly with carefully to outside of drum by mean of chain block system to outside and taking it to bottom of clarifier floor with proper care. | 1 | JOB | 2,49,850 ₹2,94,823 Lowest | 2,49,950 ₹2,94,941 |
| 7.00 | Cutting of tensile bolt of almost 16 nos. with drum which is moving with main bridge with gas cutter. And same L6 nos. bolt should be removed by hammering & other mechanical arrangements so that the hole should be free from both item and lifting it with proper chain block two leg type with carefully so that it moves upwards side and upto free from turn table parts. This known as middle part of turn table & with second chain block it level to outside of drum with chain block arrangement & making down upto clarifier floor level. | 1 | JOB | 2,49,850 ₹2,94,823 Lowest | 2,49,950 ₹2,94,941 |
| 8.00 | The foundation bolt of bottom part with the RCC block the removing of nut of all foundation bolt removing carefully so that the bottom part should free from foundation bolt & same is lifting with carefully upto the level which can easily removed with other chain block system to outside of drum etc. as required. | 1 | JOB | 2,49,850 ₹2,94,823 Lowest | 2,49,950 ₹2,94,941 |
| 9.00 | Cleaning of all turn table parts with proper cotton waste & diesel with proper cleaning of complete surface free from all oil & dust etc. as required. | 1 | JOB | 24,950 ₹29,441 Lowest | 24,970 ₹29,464.6 |
| 10.00 | First bottom part of centre mechanism lifts with chain block arrangement from bottom floor area of clarifier upto the top of clarifier & same is fixed on foundation bolt making proper level with RCC so that bottom part should be checked properly level with all respect. And tightening of all nut to existing bolt with proper tightening of each nut. | 1 | JOB | 1,74,900 ₹2,06,382 Lowest | 1,74,960 ₹2,06,452.8 |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
11 Aug 2026, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation Repairing of 05 MGD HDO make Clarifier No. 04 at Bawana WTP.
2026_DJB_296379_3
NIT NO. 05(2026-27) HP-I
Open Tender
Miscellaneous Works
Works
EE EnM HP I
please refer tender documents.
3 documents required · 3 mandatory
₹500
Account No SB 06121000095461
₹31,000
14 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old damaged paddles, scrapers, pit scrapers, vertical bridge arm for outside flocculator zone and inside flocculator zone,
bridge arm, flocculator arm etc. as required & dismantling of base of bridge from the base frame to turn table mechanism and lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making the by welding to make strong thrust support by welding process with deploying technical staff / labour, T&P tool and tackles after complete the work as per site requirement. | 1 | JOB | - | - |
| 2 | Lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making strong thrust support by welding process with deploying technical staff / labour, T&P tool & tackles to complete the work as per site requirement. | 1 | JOB | - | - |
| 3 | Servicing of centre mechanism are as under : Before opening of the centre mechanism, the whole structure of centre cage of both flocculator arm & scrapper arm. The whole weight of centre cage is totally by making support of central pit by welding of 4 Nos. vertical support with the centre cage so that complete structure is to be fixed on its position like flocculator arm support & clarifier arm support so that complete structure stand proper support while this centre mechanism should be free from these structure so removal of all parts one by one with proper carefully with lifting arrangement is to be providing at centre RCC Pillar support as required by job. | 1 | JOB | - | - |
| 4 | Making a temporary platform along the turn table to use as a working platform around the drum so that easily movement of working staff should move around the turn table. 25 Days @ 4000/-Per day. | 1 | JOB | - | - |
| 5 | Making an arrangement for removing of drive system of turn table like top bearing block, bearing block shaft, bevel pinion also from the top of turn table (centre mechanism) & taking out this item with chain block arrangement to outside of drum at bottom of clarifier & put on safer side of clarifier. | 1 | JOB | - | - |
| 6 | Cutting of all tensile nut bolt of centre cage of flocculator drum. But gas cutter almost 16 nos. tensile bolt & removing of by hammering etc. as required to free hole of both turn table as well as centre cage. & top big worn gear to be lift by overhead two leg lifting arrangement & lifting from the centre mechanism (turn table) parts & lifting with carefully in parallel way to make free from all side and with help of second chain block arrangement to keep big worn part of centre mechanism slowly-slowly with carefully to outside of drum by mean of chain block system to outside and taking it to bottom of clarifier floor with proper care. | 1 | JOB | - | - |
| 7 | Cutting of tensile bolt of almost 16 nos. with drum which is moving with main bridge with gas cutter. And same L6 nos. bolt should be removed by hammering & other mechanical arrangements so that the hole should be free from both item and lifting it with proper chain block two leg type with carefully so that it moves upwards side and upto free from turn table parts. This known as middle part of turn table & with second chain block it level to outside of drum with chain block arrangement & making down upto clarifier floor level. | 1 | JOB | - | - |
| 8 | The foundation bolt of bottom part with the RCC block the removing of nut of all foundation bolt removing carefully so that the bottom part should free from foundation bolt & same is lifting with carefully upto the level which can easily removed with other chain block system to outside of drum etc. as required. | 1 | JOB | - | - |
| 9 | Cleaning of all turn table parts with proper cotton waste & diesel with proper cleaning of complete surface free from all oil & dust etc. as required. | 1 | JOB | - | - |
| 10 | First bottom part of centre mechanism lifts with chain block arrangement from bottom floor area of clarifier upto the top of clarifier & same is fixed on foundation bolt making proper level with RCC so that bottom part should be checked properly level with all respect. And tightening of all nut to existing bolt with proper tightening of each nut. | 1 | JOB | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_394518.xls
BOQ • 0.30 MB
Feecorrigendum.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .