Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -0.05% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹97.02 (0.05%)Admitted-Finance | +0.00% | ₹1.9 L+₹97.02 (0.05%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹2,037.51 (1.05%)Admitted-Finance 103 SECTOR 16 DEEN DAYAL PURA AWAS VIKAS COLONY SIKANDRA AGRA | AGRA | AGRA | UTTAR PRADESH | +1.00% | ₹2.0 L+₹2,037.51 (1.05%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,881
Closing Date
10 Aug 2026, 11:00 amClosed
PRADHAN ST MARYS III GP
DUDHIA
CONSTRUCTION OF DRAIN AT CENTRAL LINE SANSAD I ST MARYS II GP ACTIVITY CODE 111049763
2026_GTA_1035535_1
42/STM lll/15th FC/NIT/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
ST MARYS III
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,881
Yes
18 Aug 2026
31 Jul 2026
11 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | - | cum | 119.27 | - |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | - | Sqm | 50 | - |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 1 | Sqm | 1,272 | ₹1,270.73 |
| 4 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | - | cum | 5,309 | - |
| 5 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | - | Sqm | 334 | - |
| 6 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. | - | Sqm | 206 | - |
| 7 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | - | Sqm | 34 | - |
| 8 | labour cess 1% | - | each | 1,921.28 | - |
| 9 | Add 18% GST | - | no | 29,307.65 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2543713.xls
BOQ • 0.28 MB
date.pdf
PDF • 0.08 MB
nit01.pdf
PDF • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .