Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | -20.21% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 L+₹3,052.89 (0.29%)Admitted-Finance | -19.98% | ₹10.6 L+₹3,052.89 (0.29%) | L2 | Admitted-Finance |
| 3 | L3₹11.3 L+₹74,198.37 (7.01%)Admitted-Finance | -14.62% | ₹11.3 L+₹74,198.37 (7.01%) | L3 | Admitted-Finance |
Tender Value
₹15.7 L
EMD Value
₹31,320
Closing Date
27 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PWD DN BANSWARA
EXECUTIVE ENGINEER PWD DN BANSWARA
New Construction and Repair of CD Work Under Pkg No RJ-03-02/SR/2026-27
2026_CEPWD_577182_2
NIT 06/2026-27 EE PWD DN BANSWARA
Open Tender
Civil Works
Percentage
BANSWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS MENTIONED IN NIT AND CONDITIONS
₹31,320
Yes
29 Jul 2026
24 Jul 2026
28 Jul 2026
24 Jul 2026
27 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 (II) By Mechanical Means (a) Bituminous Courses | - | - | - | - |
| 2 | A/R Bhongapura Km. 0/450. | 8.45 | Cum | 69 | ₹583.05 |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. (B) Rubble Stone Masonry in Cement Mortar | - | - | - | - |
| 4 | A/R Sagan Km. 0/160 & 2/0. | 48 | Cum | 155 | ₹7,440 |
| 5 | A/R Bhongapura Km. 0/450. | 42.5 | Cum | 155 | ₹6,587.5 |
| 6 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
(I) Ordinary soil (i) Upto 3 m depth | - | - | - | - |
| 7 | A/R Sagan Km. 0/160 & 2/0. | 81.56 | Cum | 137 | ₹11,173.72 |
| 8 | A/R Bhongapura Km. 0/450. | 29.7 | Cum | 137 | ₹4,068.9 |
| 9 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | - | - | - | - |
| 10 | A/R Bhongapura Km. 0/450. | 770 | Cum | 44 | ₹33,880 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
Tendernotice_2.pdf
PDF • 12.18 MB
BOQ_1025971.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .