| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.5 CrAdmitted-Finance | -2.79% | ₹19.5 Cr | L1 | Admitted-Finance |
Tender Value
₹20.1 Cr
EMD Value
₹40.2 L
Closing Date
29 Apr 2026, 4:00 pmClosed
Executive Engineer-I
Const. Office, P.U. Campus, Sector-14, Chandigarh
Construction of Girls Hostel No.11 (2nd floor to 6th floor) in PU South Campus Sector 25 Chandigarh
2026_PU_91612_1
179/ST
Open Tender
Civil Works - Buildings
545 days
Panjab University South Campus, Sector - 25, Chd
as per NIT
2 documents required · 2 mandatory
₹0
₹40.2 L
Const. Office, P.U. Campus, Sector-14, Chandigarh
25 May 2026
7 Apr 2026
30 Apr 2026
7 Apr 2026
29 Apr 2026
7 Apr 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. (DSR 2.8) | - | - | - | - |
| 0.0 | All kinds of soil. (DSR 2.8.1) | 50 | Cum | 242 | ₹12,100 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 0.0 | 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size).(DSR 4.1.3) | 20 | Cum | 7,691 | ₹1,53,820 |
| 0.0 | 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) (DSR 4.1.11) | 50 | cum | 5,423 | ₹2,71,150 |
| 0.0 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement (ii) 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size): (DSR 5.2.2). | 490 | Cum | 10,218 | ₹50,06,820 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 5.3). | 48.43 | Cum | 10,658 | ₹5,16,166.94 |
| 0.0 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. (DSR 5.33). | - | - | - | - |
| 0.0 | (1) All works above plinth level up to floor VII level. (DSR 5.33.2) | 1,316.25 | Cum | 10,360 | ₹1,36,36,350 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: (DSR 5.9). | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.23 MB
BOQ_112074.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid